My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
COMPLIANCE INFO 2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:06:34 PM
Creation date
11/8/2018 9:41:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\COMPLIANCE INFO 2000-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. • Page_of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: X Tank Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Uses: ❑Pressure X Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Measuring Equipment Used for Testing: Liquid Filled Vac Gauges <br /> Tank#1 RU Tank#2 SU Tank 43 <br /> Tank Capacity: 14130 14130 <br /> P ry� <br /> Tank Material: Fibersteel Fibersteel <br /> Tank Manufacturer: Trusco Trusco <br /> Product Stored: RU SU <br /> Wait time between applying IOMIN <br /> pressure/vacuum/water and starting IOMIN <br /> test: <br /> Test Start Time: 0730 0745 <br /> Initial Reading( JR : -10"HG -10"HG <br /> Test End Time: 0830 0845 <br /> Final Reading(RF): -10"HG -10"HG <br /> Test Duration: 1 HR IHR <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold: 2" 2 <br /> Test Result: PASS PASS <br /> Was sensor removed for testing? YES YES <br /> Was sensor properly replaced after YES YES <br /> testing? <br /> Comments— <br /> December 2001 <br /> SWRCB <br />
The URL can be used to link to this page
Your browser does not support the video tag.