My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
COMPLIANCE INFO 2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:06:34 PM
Creation date
11/8/2018 9:41:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\COMPLIANCE INFO 2000-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aitoring System Certification <br /> Site Address: 470 N MAIN ST Date of Testing/Service: 11/22/2005 <br /> F. In-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑x Yes ❑No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑K Yes ❑NO' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑x Yes ❑No' Was accuracy of system product level readings tested? <br /> QYes ❑No' Was accuracy of system water level readings tested? <br /> M Yes ❑No' Were all probes reinstalled properly? <br /> Q Yes I ❑No• Were all items on the equipment manufacturers'maintenance checklist completed? <br /> .In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not Installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> M Yes ❑No' ❑N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h❑0.1 g.p.h 00.2 g.p.h <br /> X Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x❑Yes ❑No Was the testing apparatus property calibrated? <br /> M Yes ❑No ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑Yes ❑No ❑x N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No' x❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑NO' 0 N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑NO' ❑x N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑Yes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 Based on CA forth dated 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.