My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
COMPLIANCE INFO 2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 12:06:34 PM
Creation date
11/8/2018 9:41:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\COMPLIANCE INFO 2000-2005.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> be used if determined by the Executive Officer, in writing, to yield comparable results. <br /> Testing the PN valve will be at the option of the local districts. If PN valve testing is <br /> required by the district, the test shall be conducted in accordance with TP-201.1 E, Leak <br /> Rate and Cracking Pressure of PressurelVacuum Vent Valves. <br /> IT IS FURTHER ORDERED that the Phil-Tite system shall be compatible with fuels in <br /> common use in California at the time of certification and any modifications to comply <br /> with future California fuel requirements shall be approved in writing by the Executive <br /> Officer or Executive Officer delegate. <br /> IT IS FURTHER ORDERED that the certification of the Phil-Tite Phase I vapor recovery <br /> system is valid through June 30, 2005. <br /> IT IS FURTHER ORDERED that Executive Order VR-1 01-C issued on <br /> September 16, 2003 is hereby superceded by this Executive Order. <br /> Executed at Sacramento, California, this ZK day of April 2004. <br /> ���` T')�-Ve��'V/ <br /> illiam V. Loscu off, Chief <br /> Monitoring and Laboratory DiviiZ <br /> Attachments: <br /> Exhibit 1 Phil-Tite Phase I Vapor Recovery System Equipment List <br /> Exhibit 2 Installation, Maintenance and Compliance Specifications <br /> Exhibit 3 Manufacturing Performance Standards and Specifications <br /> PHIL-TITE PHASE I VAPOR RECOVERY SYSTEM-VR-101-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.