Laserfiche WebLink
-3- <br /> be used if determined by the Executive Officer, in writing, to yield comparable results. <br /> Testing the PN valve will be at the option of the local districts. If PN valve testing is <br /> required by the district, the test shall be conducted in accordance with TP-201.1 E, Leak <br /> Rate and Cracking Pressure of PressurelVacuum Vent Valves. <br /> IT IS FURTHER ORDERED that the Phil-Tite system shall be compatible with fuels in <br /> common use in California at the time of certification and any modifications to comply <br /> with future California fuel requirements shall be approved in writing by the Executive <br /> Officer or Executive Officer delegate. <br /> IT IS FURTHER ORDERED that the certification of the Phil-Tite Phase I vapor recovery <br /> system is valid through June 30, 2005. <br /> IT IS FURTHER ORDERED that Executive Order VR-1 01-C issued on <br /> September 16, 2003 is hereby superceded by this Executive Order. <br /> Executed at Sacramento, California, this ZK day of April 2004. <br /> ���` T')�-Ve��'V/ <br /> illiam V. Loscu off, Chief <br /> Monitoring and Laboratory DiviiZ <br /> Attachments: <br /> Exhibit 1 Phil-Tite Phase I Vapor Recovery System Equipment List <br /> Exhibit 2 Installation, Maintenance and Compliance Specifications <br /> Exhibit 3 Manufacturing Performance Standards and Specifications <br /> PHIL-TITE PHASE I VAPOR RECOVERY SYSTEM-VR-101-D <br />