My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
470
>
2300 - Underground Storage Tank Program
>
PR0231441
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 1:58:38 PM
Creation date
11/8/2018 9:41:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231441
PE
2361
FACILITY_ID
FA0003604
FACILITY_NAME
BEACON STATION #3492*
STREET_NUMBER
470
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22307101
CURRENT_STATUS
02
SITE_LOCATION
470 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MAIN\470\PR0231441\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.2 The minimum time required to pressure the system ullage from zero (0) to <br /> two (2.0) inches H2O gauge pressure shall be calculated as follows: <br /> V <br /> [Equation9-2]t' [1522]F <br /> Where: <br /> t1 = The minimum time to pressurize the ullage to two inches H2O, <br /> minutes <br /> V = The total ullage affected by the test, gallons <br /> F = The nitrogen flowrate into the system, CFM <br /> 1522 = The conversion factor for pressure and gallons <br /> 9.3 If the policy of the local district requires an allowable tolerance for testing <br /> error, the minimum allowable five-minute final pressure, including testing <br /> error, shall be calculated as follows: <br /> Pf-F =2—[l+(100)][408.9—(P, +406.9) [Equation 9-31 <br /> Where: <br /> P,{ = The minimum allowable five-minute final pressure including <br /> allowable testing error, inches H2O <br /> E = The allowable testing error, percent <br /> P, = The minimum allowable five-minute final pressure calculated in <br /> Equations 9-1 or 9-2, inches H2O <br /> 2 = The initial starting pressure, inches H2O <br /> 408.9 = Atmospheric pressure plus the initial starting pressure, inches <br /> H2O <br /> 406.9 = Atmospheric pressure, inches H2O <br /> 10. Reporting <br /> 10.1 The calculated ullage and system pressures for each five-minute vapor <br /> recovery system test shall be reported as shown in Form 3-1. Be sure to <br /> include the Phase I system type (two-point or coaxial), the Phase II system <br /> type, whether the system is manifolded, and the one-minute pressures <br /> during the test. <br /> 1 <br /> G-70-164 Exhibit 3-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.