Laserfiche WebLink
19. Piping (cross-sectional diagram, including connections to tank and dispensers)- <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> Restricts delivery of flow To tank CSaction 2635 (b) (Z) (a) or CC)), or <br /> Provide positive shut off of flow to the tank at no more than 95 Z (Section 2635 Cb)(2)(CII, or <br /> Cg) Vapor recovery piping designed so it carrot contain liquid phase product, or <br /> (C) Suction piping <below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)1 <br /> sloped so contents of the pipe will drain back into The storage tank If the suction is <br /> released. <br /> No valves or pimps installed below grade. <br /> Inspection method Provided To demonstrate compliance with section 2636 (a) (3)- <br /> Corrodiblt underground piping protected against corrosion (Section 2636 (b)). <br /> (E) underground primary piping will oeeT all of :he following requirements <br /> Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary contai munt system in the fora of: secondary pipe--- Veult or <br /> Lined trench- to be sloped to a collection ump at the low point of the piping. <br /> Primary piping and secadary containment syst.e will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) <br /> Underground ping with secondary containment will be equipped and monitored as follows: <br /> Secondary containeent will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. �/ ]� <br /> Autommtic lire leak detectors will be ioanta prassu ized Piping /` Y <br /> Manufacturer:L Model: <br /> _ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> Annual line tightneas test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring 5ystw <br /> fails or is discornscted. <br /> 20. '� State Yater Resources Control Board •facility (A)" and "Talk Permit IS)" application forms submitted. <br /> 21. � Plan review and operating pKmiL nets paid. <br /> 22. ✓ what is the approximate depth to ground water <br /> (incltrde source of information - bon ole logs, wnitonr;�q wall data, water <br /> studies, etc.) <br /> a ✓/.r / 4���/ /�„� �/ <br /> l/vv J Z <br /> Z3. '/ betel number of tanks on site <br /> after lrtstal lotion: <br /> 24. ✓ Canty/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility Cin accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> gequirenanT37 as an owner or operator to submit a workplan to PHS-END Site Mitigation unit prior to initiating any <br /> aaaessmenr or remediation activities. For further assistance eonteer the Site Mitigation Unit at (2D9) 469-3450. <br /> The wrier or open for must acknowledge this responsibility for worrkplan submittal by signature and date below. <br /> Name T{elf <br /> �A0 EC'9` Date 0- <br /> COMD ITICNS OF APPROVAL: <br /> 8 <br />