Laserfiche WebLink
IdIL <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> tpp rankology <br /> 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2236215 <br /> TEST DATE: 05/12/05 AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: CONOCO-PHILLIPS SITE: CONOCO PHILLIPS #2705445 <br /> _ TANK INFORMATION;-_ = "" <br /> Tank ID: 2 Tank manifolded: NO Bottom to top fill in inches: <br /> Product: SUPREME Vent manifolded: YES Bottom to grade in inches: <br /> Capacity in gallons: 9,816 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 92.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 345 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FIBERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> .. ._. ; <br /> `t:EAK=DETECTORaTESTRESULTS.���A;t'.�eSLxnethAd : <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: FE PETRO <br /> Fluid volume in gallons: Model: MLD <br /> Tank water level in inches: S/N: unreadable <br /> Test time: NOT Open time in sec: 4.00 <br /> Number of thermisters: TESTED Holding psi: 17 NOT <br /> Specific gravity: Resiliency cc: 184 TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 12 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> tlLrdG TEST RESU ttisd LINESTEST.RESULTS3 - TgSt type G <br /> :—sn-x. ..,v. <br /> Test time: Material: DN FIBERG <br /> Ullage volume: Diameter(in): <br /> Ullage pressure: Length (ft): <br /> Results: Test psi: <br /> Bleedback cc: <br /> Test time (min): <br /> DATA FOR UTS-4T ONLY: <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 05/31/2005 08:45 SBOW ERS <br />