Laserfiche WebLink
Atoring System Certification 0 <br /> Site Address: 1206 E MARCH LANE Date ofTesting/Service: 05/12/2005 <br /> F. In-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑X Yes ❑No• Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑X Yes ❑No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes QNo' Was accuracy of system product level readings tested? <br /> Dyes ❑x No' Was accuracy of system water level readings tested? <br /> FXJ Yes ❑No' Were all probes reinstalled properly? <br /> Q Yes ❑No•I Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Q Yes ❑No• ❑N/A (Check all that apply)Simulated leak rate: Q 3 g.p.h ❑0.1 g.p.h ❑0.2 g.p.h <br /> M Yes ❑No• Were all LLDs confined operational and accurate within regulatory requirements? <br /> X Yes ❑No• Was the testing apparatus properly calibrated? <br /> M Yes ❑No• ❑N/A For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> ❑Yes ❑Ne' ©N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes ❑No' M NIA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> ❑Yes ❑No' M N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ❑Yes ❑No• ❑X N/A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> IEYes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> COULD NOT VERIFY OVERFILL ALARM (CAP PROBES) <br /> COULD NOT VERIFY CAP PROBE READINGS. <br /> Page 3 of 3 Based on CA form dated 03/01 <br />