Laserfiche WebLink
Jun 01 07 05: 25p Mary & Tom Muru 209-951-1414 p. 3 <br /> 0 0 <br /> Designated Operator (DO) Employee Training <br /> Site Number: DO Name& Certificate No.: SSemu N Hahte,5305249-111C <br /> Site Address: � � Dnp a v !y �4pas�?"Orr! CJS QS�ia <br /> • Designated UST Operator's Primary Responsibilities <br /> 1. Monthly visual inspections of the UST facility <br /> 2. On-the-job trailing for "facility employees" every twelve months, starting July 1, 2005. <br /> Employees hired on or after July 1, 2005 must be trained within 30 days of their date of hire. <br /> • DO Employee Training Topics <br /> 1. Understanding LIST System Components and Operations <br /> A. Tank information for the site: Sire, Material, installation date,and type <br /> B. Overfill and spill protection: Turbine sumps, spill buckets, and under-dispenser containmcnLs <br /> C. Piping: Material, types and installation date <br /> D. Site Plot Plan—Locations of UST systems(1-IMMP) <br /> 2. Understwiding Leak Detection System(s) <br /> A. UST leak detection methods (e.g., ATG, SIR, CSLD, or CM) and devices (e.g., Interstitial <br /> Monitoring),product piping leak detection, sensors in the sumps. <br /> B. Types and functions of leak detection systems (e.g., electronic or mechanical) <br /> C. Tank Testing Results, inventory Reconciliation and Daily&Monthly Inspection Checklists <br /> 3. &ALL din ty o System Alarms <br /> A. Difference between an alarm and a system failure(Delivery Needed& Fuel Alarms) <br /> 13, Emergency Contact Information—SolvOne or Regional HSE Specialist <br /> C. Alarm Log Update <br /> 4. Spill & Leak Response <br /> A. Spill/Overfill Response Procedure <br /> B. Spill response equipments <br /> C. L-'mcrgeney Shut-off Button <br /> D. Disposal of Waste <br /> fim to ce NamcSi nature Date JEm to ec Name Signature Date <br /> - an JJr% N�Lk <br /> MAiNTAIN THIS FORM UNDER ENVIRONMENTAL RECORD NOX TAB 144 <br />