Laserfiche WebLink
Y <br /> Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name:ConocoPhilli s Site#2705445 1 Date:9/28//06 <br /> Facility Address: 1206 E.March Lane <br /> City:Stockton I Zip Code:95210 <br /> Designated UST Operator Conducting the Inspection:Julie Lee <br /> International Code Council Certification#:5248777-UC I Expiration Date: 12/14/2006 <br /> Signature: <br /> Phone:(510)245-5218 <br /> �'d` <br /> Y=Yes.N=No,NA=Not Applicable <br /> Item MONITORING PANEL/ALARM HISTORY Y N NA <br /> 1 Monitoring system is powered on and in proper operating mode. x <br /> 2 Monitoring system is not currently showing any alarms or warnings. x <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the x <br /> Designated UST erator. Attach a copy of the alarm history repory7og to thisform if available. <br /> 4 Each alarm for the previous month has been responded to appropriately. x <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. x <br /> 5a - List all tank-top sumps where alarms occurred in the past month: <br /> N/A <br /> Note:Sumps where an alarm has occurred in the past month most be inspected unless a qualhed service technician responded to,and <br /> properly addressed,the cause of the alarm.Attach documentation verging appropriate service to this report. <br /> ifstunto inspection is required,record results in item 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual inspection o sums is only required in sumps where an alarm has occurred in the past month or which there is no service record. <br /> Y NY N <br /> Sump Location: Sump <br /> um Location: <br /> Sump Location: Sump Location: <br /> Sump Location: Sump Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1—Contents:87 x Tank 3—Contents:91 x <br /> Tank 2—Contents:Diesel I x I Tank 4—Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located )toperl . <br /> Y N LDis <br /> Du enser 1/2 x r 7/8 x <br /> Dis enser 3/4 x r 9/10 x <br /> Dis enser 5 x r 13/14 <br /> Dis enser 6 x r 15/16 <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. x 5/5/06 <br /> 10 Secondary containment tests have been completed within the required timeframe. x 12/29/04 <br /> 11 Spill containment structure bucket testing was completed within the past year. x 5/5/06 <br /> 12 Tank tightness testing was completed within required timeframe. x <br /> 13 Line tightness testing was completed within required timeframe. x <br /> 14 Other required testing/maintenance was completed within required timeframe. List y1maintenance items below. <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> 15 All facility employees have received the required on-the-job training within the past year. x <br /> 16 All facility employees hired within the past 30 days have received the required on-the-job training. I x <br /> Note: Any answer of"M'should be explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Page 1 of 2 <br />