Laserfiche WebLink
• <br /> Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name:ConocoPhilli s Site#2705445 1 Date:8/29//06 <br /> Facility Address: 1206 E.March Lane <br /> City:Stockton I Zip Code:95210 <br /> Designated UST Operator Conducting the Inspection:Julie Lee <br /> International Code Council Certification#:5248777-UC Expiration Date: 12/14/2006 <br /> Si ature: "4. Phone:(510)245-5218 <br /> Y=Yea N=No NA=N07A ticnble <br /> Item MONITORING PANEL/ALARM HISTORY Y N NA <br /> 1 Monitoring system is powered on and in proper operating mode. r <br /> 2 Monitoring system is not currently showing any alarms or warnings. ax,3 Alarm history report/log for the previous month is available,and has been reviewed by the Desi ated UST erator. Attach a co o the alarm histo re or0o to this orm i available.4 Each alarm for the evious month has been res onded to a ro riatel .5 Sensors located in tank-to containment sum s have not alarmed in the ast month. <br /> 5a _ List all tank-top sumps where alarms occurred in the past month: <br /> N/A <br /> Note:Sumps where an alarm has occurred in the past month must be inspected unless a qua ifiedservice technician responded to,and <br /> properly addressed,the cause ofthe alarm.Attach documentation verifying appropriate service to this report. <br /> Ifstimp inivection is required,record results in item 6,below. <br /> s <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual inspection o sums is only requi in sumps where an alarm has occurred in the past month for which there is no service record <br /> Y N Y N <br /> Sump Location: Sump Location: <br /> Sump Location: Sump Location: <br /> Sump Location: Sump Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1 —Contents:87 x Tank 3—Contents:91 x <br /> Tank 2—Contents:Diesel x I I Tank 4—Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located ro erl . <br /> Y N NA I Y N NA <br /> Dir enser 1/2 x Dispenser 7/8 x <br /> Dispenser 3/4 x I Dispenser 9/10 x <br /> Dispenser 5 x I Dispenser 13/14 <br /> Dispenser 6 x Dispenser 15/16 <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. x 5/5/06 <br /> 10 Secondary containment tests have been completed within the required timeframe. x 12/29/04 <br /> 11 Spill containment structure(bucket)testing was completed within the past year. x 5/5/06 <br /> 12 Tank tightness testing was completed within required timeframe. x <br /> 13 Line tightness testing was completed within re uired timeframe. x <br /> 14 Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenance: <br /> Test/Maintenance. <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING JYJ N INA <br /> 15 1 All facility employees have received the required on-the-job training within the past year. I x <br /> 16 1 All facility employees hired within the past 30 days have received there uired on-the-job trainin . x <br /> Note: Any answer of"N"should be explained in the comment section on the fo lowing page,and will require <br /> follow-up action. <br /> Page 1 of 2 <br />