Laserfiche WebLink
Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name:ConocoPhilli s Site#2705445 Date:5/18//06 <br /> Facility Address: 1206 E.March Lane <br /> City:Stockton Zip Code:95210 <br /> Designated UST Operator Conducting the Ins ection:Julie Lee <br /> International Code Council Certification#:5248777-UC I Expiration Date: 12/14/2006 <br /> Signature: � � <br /> Phone: 510 245-5218 <br /> `'O° ' <br /> Y=Yes,N=No,N1=NotA licable <br /> Item MONITORING PANEL/ALARM HISTORY Y N NA <br /> e <br /> 1 Monitoring system is powered on and in proper operating mode. x <br /> 2 Monitoring system is not currently showing any alarms or warnings. x <br /> 3 Alarm history report/log for the previous month is available,and has been reviewed by the x <br /> Designated UST Operator. Attach a copy o the alarm history report/7oreporkl7og to this form i available. <br /> 4 Each alarm for the previous month has been responded to appropriately. x <br /> 5 Sensors located in tank-top containment sumps have not alarmed in the past month. x <br /> 5a _ List all tank-top sumps where alarms occurred in the past month: <br /> N/A <br /> Note:Sumps where an alarm has occurred in thepast month must be inspected unless a qualifiedservice technician responded to,and <br /> properly addressed,the cause ofthe alarm.Attach documentation verifying apprepriate service to this report. <br /> if snnw ins ,,tion is required,record results in item 6,below. <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> Note:Visual inspection o sums is only required in sumps where an alarm has occurred in the past month for which there is no service record. <br /> Y N Y N <br /> Sump Location: Sump Location: <br /> Sump Location: Sump Location: <br /> Sump Location: Sump Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> Tank 1—Contents:87 x Tank 3—Contents:91 x <br /> Tank 2—Contents:Diesel x I I I Tank 4—Contents: <br /> 8 Under-dispenser containment areas are free of water,debris,and hazardous substance. Sensors are located noperly. <br /> Y N NA I Y N NA <br /> Dispenser 1/2 xDis eraser 7/8 x <br /> Dispenser 3/4 x Dis eraser 9/10 x <br /> Dispenser 5 x Dispenser 13/14 <br /> Dis enser 6 x Dis enser 15 116 <br /> PAPERWORK INSPECTION )LN NA DATE DONE <br /> 9 Monitoringsystem certification has been completed within past 12 months. x 5/5/06 <br /> 10 Secondary containment tests have been completed within the required timeframe. x 12/29/04 <br /> 11 Spill containment structure(bucket)testing was completed within the past year. x 5/5/06 <br /> 12 Tank tightness testing was completed within required timeframe. x <br /> 13 Line tightness testing was completed within required timeframe. x <br /> 14 Other required testing/maintenance was completed within required timeframe. List test/maintenance items below. <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> Test/Maintenance: <br /> FACILITY EMPLOYEE TRAINING Y N I NA <br /> 15 1 All facility employees have received the required on-the-job training within the past year, x <br /> 16 1 All facility employees hired within the past 30 days have received the required on-the-job training. I x <br /> Note: Any answer of 11N"should be explained in the comment section on the following page,and will require <br /> follow-up action. <br /> Page 1 of 2 <br />