My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND T ST RESULTS <br /> i Tanknology <br /> TEST DATE: 05/03/07 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 2248821 <br /> AUSTIN,TEXAS 78759(512)451-6334 <br /> CLIENT: CONOCO-PHILLIPS SITE: CONOCO PHILLIPS #2705445 <br /> TANK INFORMATION <br /> Tank ID: i Tank manifolded: NO Bottom to top fill in inches: <br /> Product: UNLEADED Vent manifolded: YES Bottom to grade in inches: <br /> Capacity in gallons: 91816 Vapor recovery manifolded: YES Fill pipe length in inches: <br /> Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: <br /> Length in inches: 353 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DN FIBERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST RESULTS Test Method: LEAK DETECTOR TEST.RESULTS Test method: <br /> PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: PE PETRO <br /> Fluid volume in gallons: Model: NLD <br /> Tank water level in inches: S/N: vu <br /> Test time: NOT Open time in sec: 5.00 <br /> Number of thermisters: TESTED Holding psi: 12 NOT <br /> Speck gravity: Resiliency cc: 125 TESTED <br /> Water table depth in inches: Test leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi: 11 <br /> Leak rate in gph: Calib. leak in gph: 3.00 <br /> Result: Results: PASS <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTes{Method: LINE TEST RESULTS Test type: . <br /> Test time: Material: DW FIBERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Ullage pressure: Length(ft): 200.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR LITS-4T ONLY: Test time(min): <br /> Test 1:Start time: <br /> Time Of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph: <br /> Temperature: Result: <br /> Flow rate(cfh): Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Printed 06/01/2007 08:48 ACRAMER <br />
The URL can be used to link to this page
Your browser does not support the video tag.