Laserfiche WebLink
SWRCB,January 2002 Page 2 <br /> 9. ALL/OVERFILL CONTAINMENT AS <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer lfl Industry Standard Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: Q Pressure ❑ Vacuum Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 UNL FILL Spill Box# 2 SUP FILL Spill Box# 3 DIE FILL Spill Box# <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 10 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 1MIN 1MIN 1MIN <br /> starting test: <br /> Test Start Time: 900 900 900 <br /> Initial Reading(RI ): 7" 71/4" 7" <br /> Test End Time: 1000 1000 1000 <br /> Final Reading(RF ): <br /> 7" 71/4" 2" <br /> Test Duration: 1HR 1HR 1HR <br /> Change in Reading(R F-RI ) 0 0 5" <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass L-1Fail Pass 0 Fail LfP,ass [z] Fail Pass Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />