My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 2 <br /> 9. ALL/OVERFILL CONTAINMENT AS <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer lfl Industry Standard Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: Q Pressure ❑ Vacuum Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 UNL FILL Spill Box# 2 SUP FILL Spill Box# 3 DIE FILL Spill Box# <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 10 10 10 <br /> Wait time between applying <br /> pressure/vacuum/water and 1MIN 1MIN 1MIN <br /> starting test: <br /> Test Start Time: 900 900 900 <br /> Initial Reading(RI ): 7" 71/4" 7" <br /> Test End Time: 1000 1000 1000 <br /> Final Reading(RF ): <br /> 7" 71/4" 2" <br /> Test Duration: 1HR 1HR 1HR <br /> Change in Reading(R F-RI ) 0 0 5" <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass L-1Fail Pass 0 Fail LfP,ass [z] Fail Pass Fail <br /> Comments- (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.