My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 08 07 09: 47a Elite Contractors Inc 2094616342 P. 1 <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 2 sets of plans&applications as originals will be ret y EHD) <br /> 1. Site map enclosed YES[] NOK <br /> 2. Manufacturers spec sheets attached for all equipment to be installed YES[] NO[J <br /> 3. Description of work to be completed(If adding piping. UDC's, or other UST equipment, or performing tank top up{grade, <br /> use the T Ins Ration Applicatio pa 8 as n ry for a timely plan ew): tr.,/ fi il/ <br /> ,12 <br /> 4. Description of equipment to I>e (Attach drawingsfblueprints as nese�ry): <br /> �r�used� /C �,Cy <br /> 5. All equipment is State certified or approved. YES l NO[] ,.,,�X.r✓ CX,� ��LW� p <br /> 6. Decontamination Procedures: / ' <br /> a. Will piping be decontaminated prior to removal? YES[] QVO <br /> b. ldentifycontractorperforming decontamination: <br /> Name Phone(_ <br /> Address City �P <br /> c_ Describe method to be used for decontamination: <br /> d_ Describe how rinsate material will be stored onsite prior to manifesting offsite: <br /> e_ Rinsate Hauler and permitted Treatment,Storage&Disposal Facility: <br /> Hauler Name Phoneme_) Hauler Reg# <br /> Address City Zip <br /> Permitted Disposal Site <br /> 7. a. Describe the method that will be utilized to purge andfor inert the piping: <br /> b. Piping Hauler- <br /> Nam <br /> aulerName Phone <br /> Address CityZD <br /> Hauler Registration f1(if hauled as hazardous) <br /> c. Piping Disposal Site: <br /> Name Phone <br /> Address City ZiP <br /> EPA ID#(rf transported to a permitted TSD facirdy) <br /> 8_ Is the sampling firm an independent third party from the contractor?YES[J NO[J <br /> 9. Describe, in detail,how the soil and/or water sample(s)beneath the piping or dispenser will be obtained: <br /> 10_ Handling of excavated sol(Contaminated Soil Hazardous Waste Hauler): <br /> Name Hauler Registration 8 Phone C___)_ <br /> Address City Zip <br /> b) if soil is not to be hauled, describe what will be done with it <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.