My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:36:29 PM
Creation date
11/8/2018 9:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2004 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2007
QuestysRecordDate
4/6/2018 9:22:04 PM
QuestysRecordID
3847503
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.fcMay Q8 07 09: 49a Elite Tv Contractors Inc 2094616342 p. 4 <br /> WHAT DOES EVR40EAN FOR GASOLINE <br /> DISPENSING FACILITY OPERATORS? ` <br /> Q OPW 61JSK-4400-EVR some jurisdictions arealready.iPfingEVR. " <br /> JACK SCREW 3 ,r Fe,I:,F, Others areconsidering adaptinREVR orcertain <br /> .. <br /> portions of the regUiremertts Stilt"others are taking <br /> a wart and see poslhoas EVR progresses. One <br /> thing Is Certain:virtuallyell idrisdictions willaccept <br /> P new EVIL`equipment;some will not accept old <br /> GARB approved equipment. <br /> $HOULD`YOU CONSIDER UPGRADING TO ` <br /> s7 THE NEW:EVR EQUIPMENT <br /> A k. <br /> rs 1: Some Impoirtant facts to consider when developing <br /> an e. prnent strategy in the face of the uncertain <br /> OPW 1DK 2100-EVR a regulatoryenvironment: <br /> s 1. Equipment certified under previous CARE <br /> DRAIN VALVE regulationsdecertified Is deceed as the,r;ew EVR <br /> standdtds take effettr?bere IS n'a rTtechanlsm <br /> Q DPW 61 SO-40OC-EVR SERIES by which this equ}p�i let can beconietecefttfiied + <br /> to the old standards Li wise 110 neva or <br /> OVERFILL PREVENTION VALVE <br /> improved equipmeit Carl become certified to <br /> the old CARE requirrrients''(CARB well only <br /> ' -certify equipment to the,new EVR requirements). <br /> The old &ARB regulations, and therefore <br /> • equipment approved under the previous <br /> CARB requirements,will become obsolete. <br /> SEALED 2 It seems;inevitable'diaCEVR vvlll;become the <br /> PIVOT new standard In many Jun sdramns. Nowthat EVR <br /> equipment Is available,jurisdictions that follow <br /> CAP16P1 vill be compelled to adopt the.new more <br /> stringent EVR standards. <br /> S 3 The performance of the Nevi EVR equipment <br /> rz, <br /> is superiorThe EVR,regwremefI * and testing , <br /> protocol force manufacturers to.develop more <br /> robust, ever tighter,and more reliable products. <br /> 4. Installing EVR certified equipment provides a <br /> 1 ?� THREADED *n higher level of protection against fugitive emissions <br /> USA Pa-zit No.4,986,320; TUBER ' - and pressure dewy test failures. <br /> 5,564,464;5,174,345; 5.'installing EVR cert)led equipment 1.provides a lent <br /> 5,472,012;5,850,849 <br /> safe fueling en tJrgnment orad enhances air quality. <br /> 0 OPW 6111-1400 WHY LOOK Tp`OPW fOR YOUR <br /> TANK BOTTOM PROTECTOR VAPOR,' EC WRY EQUIPMENT? <br /> Sigrnficant engineering an&financlal resources , <br /> are requlred;to meet the design and certification pts <br /> �r ,� k' � ';'� g challenge;grmposed on manufacturers by EVR:As�y� ;` , ins <br /> a � t(e rnduskry..ltTMaderIn Vapor Recovery egwpmerLf ,z R <br /> OPW Jias the necessaiYcesfxttrces and commttLeUt <br /> fo continually meet N1gatFiellenges. Unmatched <br /> R&D,engineentlgmanufacturing QC--;p and customer <br /> o serOce,art lh Tit capabilities of OM that continue <br /> t ;o keeps mparry at the fgrefrail't'of technology <br /> F ,.epp ing it'fa offer rnnovafine products to keep pace I*#i y <br /> ?rT with the mole stnngent'regulations. OPW is, indeed, * Nur' <br /> uniquely p6sAioned as Litt: supplier of choice for the ; <br /> Mas <br /> industry`s <br /> eds equipment ne <br /> n� <br />
The URL can be used to link to this page
Your browser does not support the video tag.