My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System (CERS) Underground Storage Tank-Monitoring <br /> Facility/Site <br /> DP& DK Investments, Inc. UST Tank# CERS ID <br /> 206 E MARCH LN TA0117507 10180733 <br /> TOCKTON,CA 95210 Tank Info:Installed Date:11/26/199112:00:00 AM-Tank Use:Motor Vehicle Fueling-Tan <br /> Contents:Diesel-Type Of Tank:Double Wall-Piping Construction:Double-walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Panel Model# Leak Sensor Model# <br /> TLS 350 794380-208,205 <br /> Yes Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> VMI 99-LD2000 <br /> Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> LLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> Pipeline Integrity Testing Visual Pipeline Monitoring'E C ■ I V E D <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequen �Jn�aemw <br /> APR 1 1 2017 <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System ENVIRONMENTAL HEALTH <br /> Other Pipeline Monitoring IDEPARTMENT <br /> Under Dispenser Containment(UDC)Monitoring <br /> DC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Continuous Yes <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer Yes <br /> EEDER ROOT Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model# Yes <br /> LS-350 UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer Yes <br /> VEEDER ROOT UDC Construction <br /> DC Leak Sensor Model Single-walled <br /> 94380-208,205 UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Periodic System Testing <br /> ELD Testing <br /> Yes Secondary Containment Testing <br /> Yes Spill Bucket Testing <br /> Printed on 4/11/2017 10:21 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.