Laserfiche WebLink
D.Results of Testing/Servicing MAY 12 2016 <br /> Software Version Installed: 333.02 <br /> Complete the following checklist: <br /> • Yes f No* Is the audible alarm operational? <br /> • Yes �' No* Is the visual alarm operational? <br /> (* Yes �" No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> (� Yes fNo* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir Drooer operation? <br /> Yes f No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> (� Yes (' No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> (� N/A system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> all that apply)F Sump/Trench Sensors; F Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?G Yes; 41 No <br /> (+ Yes (' No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> r N A Prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> / so at what percent of tank capacity does the alarm trigger?90% <br /> No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> (± Yes* r No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product; r Water.If es describe causes in Section E below. <br /> (+ Yes (' No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> * Yes (~ No* Is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> ABOUT 5 OZ OF LIQUID OUT OF DIESEL SUMP <br /> Monitoring System Certification Page 2 of 3 12/07 <br />