Laserfiche WebLink
RECEIVEL <br /> D.Results of Testing/Servicing <br /> Software Version Installed: 333.02 MAY 11 2015 <br /> Complete the following checklist: L <br /> • Yes r No* Is the audible alarm operational? <br /> i+ Yes No* Is the visual alarm operational? <br /> r, Yes No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir proper operation? <br /> Yes f No* f alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> N/A <br /> • Yes f No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> t N/A ystem detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> all that apply) Sump/Trench Sensors; r Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?f`+ Yes; r No <br /> C: Yes No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> N/A o at what percent of tank capacity does the alarm trigger?95% <br /> * Yes* No as any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section El below. <br /> * Yes* C No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> P Product; W Water.If yes,describe causes in Section E below. <br /> + Yes C No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> + Yes f No* is all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> LIQUID IN DIESEL SUMP-APPROX 1 CUP <br /> Monitoring System Certification Page 2 of 3 12/07 <br />