My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO 2011 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2023 4:54:06 PM
Creation date
11/8/2018 9:42:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2017
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\COMPLIANCE INFO 2011 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2011 - 2017
QuestysRecordDate
4/9/2018 3:51:45 PM
QuestysRecordID
3847565
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 * <br /> RECEIVED <br /> SWRCB,January 2002 Page 1 of 1 <br /> 9. SPELL/OVERFILL CONTAINMENT BOXES MAY 15 2 Q 1.4 <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> ENVIRONMENTAt <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: Spill Bucket Manufacturer Fv1J Industry Standard ❑ Professional Engineer <br /> F Other(Specify): <br /> Test Method Used By: r Pressure ❑ Vacuum 0 Hydrostatic <br /> F Other(Specify): <br /> Test Equipment Used: LAKE TEST Equipment Resolution:0.0625 in. <br /> Spill Box#Tank 1 Spill Box#Tank 2 Spill Box#Tank 3 <br /> REGULAR-Fill I - PREMIUM-Fill 1- Diesel-Fill 1 -Direct- Spill Box# <br /> Direct-Grade level Direct-Grade level Grade level <br /> Bucket Diameter: 12.00 12.00 12.00 <br /> Bucket Depth: 12.00 12.00 12.00 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min min <br /> starting test <br /> Test Start Time: 09:00:00 09:00:00 09:00:00 <br /> Initial Reading(Rj): 11.50 in.H2O 12.00 in.H2O 12.00 in.H2O <br /> Test End Time: 10:00:00 10:00:00 10:00:00 <br /> Final Reading(RF): 11.50 in.H2O 12.00 in.H2O 12.00 in.H2O <br /> Test Duration: 1 hr 1 hr 1 hr <br /> (RF-RO: 0.00 in.H2O 0.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-0.00 +/-0.00 +/-0.00 +/- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2317840 <br />
The URL can be used to link to this page
Your browser does not support the video tag.