Laserfiche WebLink
IVED <br /> RECE <br /> S WRCB,January 2002 hj AY 15 -.,,loge 1 of 1 <br /> 6.PIPING SUMP TESTING <br /> Test Method Developed By: r Tank Manufacturer W Industry Standard r-EMM0819AL <br /> F Other(Specify) <br /> Test Method Used By: F Pressure F Vacuum F7 Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: 0.00001 in. <br /> STP Containment for STP Containment for STP Containment for <br /> Tank 3 Diesel-1 Tank 2 PREMIUM-I Tank 1 REGULAR-1 <br /> Sump Diameter/Dimensions: 48 in. 48 in. 48 in. in. <br /> Sump Depth: 60.00M' . 60.00 in. 60.00 in. in. <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 21.00 21.00 21.00 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 2800 2800 2800 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested' 24 24 24 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both t* Yes r No r NA t+ Yes r Not"` NA C: Yes r No f NA r, Yes r No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time 02:00:00 sec 02:00:00 sec 02:00:00 sec sec <br /> Is system programmed for fail-safe G Yes f Nor NA t: Yes r Nor NA r* Yes f No r NA r Yes r Nor NA <br /> shutdown?* <br /> Was fail-safe verified to be r Yes r Nor NA f: Yes r Not"" NA f: Yes r Nor NA r Yes r No C NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min min <br /> test <br /> Test Start Time: 11:38:00 10:48:00 09:54:00 <br /> Initial Reading(Rj): 0.00000 in. 0.00000 in. 0.00000 in. <br /> Test End Time: 12:38:00 11:18:00 10:24:00 <br /> Final Reading(RF): 0.00040 in. -0.00100 in. -0.00060 in. <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(RF-R1): 0.00040 in. -0.00100 in. -0.00060 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/-0.00200 +/-0.00200 +/- <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? t* Yes r No C NA l: Yes r No r NA t": Yes r Nor NA r Yes r Nor NA <br /> Was sensor properly replaced and r- Yes r Nor NA f* Yes r Nor NA f: Yes C No C NA f Yes r Nor NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. <br /> WO:2317860 <br />