Laserfiche WebLink
r%tr—■ .ra ■e lra 0 <br /> RECEIVED <br /> SWRCB,January 2002 r;"AY 11ig2 a1A2 <br /> 7.UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: CUDC Manufacturer F Industry Standard r Prof L <br /> rz Other(Specify) HEALTH DEP RTME 4T <br /> Test Method Used By: r Pressure r Vacuum W Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used:VPLT Equipment Resolution:0.00001 in. <br /> UDC#7/8 UDC#9/10 UDC# UDC# <br /> UDC Manufacturer: unknown unknown <br /> UDC Material: <br /> UDC Depth: 30.00 30.00 <br /> Height from UDC Bottom to Top 10.00 10.00 <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 10.00 10.00 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to good good <br /> testing: <br /> Portion of UDC Tested' 12 12 <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both <+ Yes r Nor NA t` Yes t' Nor NA r Yes r No f"' NA r Yes r Nor NA <br /> product and water)?* <br /> Turbine shutdown response time 02:00:00 sec 02:00:00 sec sec sec <br /> Is system programmed for fail- r Yes r No r NA t* Yes C No r NA f Yes r Nor NA r Yes r Nor NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ( Yes r No 0 NA Ir Yes f Nor NA r Yes r No f NA r Yes C Nor NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min min thin <br /> starting test <br /> Test Start Time: 13:25:00 13:25:00 <br /> Initial Reading(RI): 0.00000 in. 0.00000 in. <br /> Test End Time: 13:40:00 13:40:00 <br /> Final Reading(RF): 0.00000 in. -0.00010 in. <br /> Test Duration: 15 min 15 min <br /> Change in Reading(RF-RI): 0.00000 in. -0.00010 in. <br /> Pass/Fail Threshold or Criteria: +/-0.00200 +/-0.00200 +/- <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? (: Yes r Nor NA t: Yes r No r NA r Yes r Nor NA r Yes f Nor NA <br /> Was sensor properly replaced and r Yes No f NA f: Yes r Nor NA C Yes r No C NA r Yes 0 Nor NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an asterisk(')is"NO"or"NA",the entire UDC must <br /> be tested. <br /> WO:2317860 <br />