Laserfiche WebLink
03/30/2013 08 11 (209)465-4988 Henderson Maintenance Co Page 1;5 <br /> ' • <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES[] NO)( <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> PERMIT ADDENDUM SR0066497 Replace 91 fill bucket and drop tube.0 . 'z9- Za-3 <br /> l <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> OPW IC-2100Q_DEVR� SPILL BUCKET FILL OPW Cast iron base. 5 gallon with cast iron lid. <br /> 61T-7368 DROP TUBE Without Overfill 4"X 15' OPW DEEP BURY <br /> 2 <br />