My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_PLAN 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
REMOVAL_PLAN 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:21:15 PM
Creation date
11/8/2018 9:43:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
PLAN 1991
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\REMOVAL PLAN 1991.PDF
QuestysFileName
REMOVAL PLAN 1991
QuestysRecordDate
11/16/2011 8:00:00 AM
QuestysRecordID
178257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHS-EHD - UNDERGF•ND TANK CLOSURE/ABANDONMA INSPECTION <br /> (SHADED AREA TO BE FILLED IN FOR THE FIRST TANK ONLY) <br /> �iam�nw�Hi�€uwayaru�wm�r�ruwruwwwwww wwwi u�v����!aw uruwwiuiuiaraiuiuiur'�yiurr��iuwr�viuw uruvii�w� <br /> OWNER NAME 3 ( OWNER PHONE # J4 <br /> E <br /> N CONTRACTOR ') n C� CON. PHONE# <br /> E <br /> R SJLHD, G�ERMIT # EF'R # FIRE PERMIT # � <br /> MEN <br /> GG ✓ � i � H �- f GCGG <br /> L <br /> � <br /> I <br /> INSPECTO DATE3� 1q I TANK # 39 <br /> R RINSED O/N) METHO � RINSE AMOUNT <br /> I <br /> N RINSATE DISPOSAL SITE <br /> S <br /> E MANIFEST # -OR- OTHER <br /> V VAPORS PURGED (Y/N) METHOD AMOUNT USED <br /> A <br /> P L. E. L. READING AT REMOVAL (MUST BE ( 20/) <br /> 0 <br /> T R COMMENTS <br /> A <br /> N TANK MATERIAL (STEEL, . IBERGLASS� OTHER) TANK SIZE Ib bQ <br /> K C <br /> / 0 TANK CONDITION60OD POOR, HOLES) <br /> ';'.I ...:., N <br /> ,.,..y.. S PIPE MATERIAL (STEEL, ''FL IBERGLAS , OTHER) # FEET <br /> P T <br /> I PIPING CONDITION (GOOD, POOR, HOLES) <br /> N <br /> G D PTH SOIL TYPE OBSERVATION SAMPLE # <br /> T a <br /> F A � -C) CNsT <br /> I N <br /> E K c SI- <br /> L <br /> D EXCAVATION SIZE: X X YDS OF SOIL: <br /> S I <br /> I A DEPTH SOIL TYPE OBSERVATION SAMPLE # <br /> N M P <br /> S P I S <br /> i G L G <br /> E I E <br /> C N <br /> T G TRENCH DIMENSION X _ X YDS OF SOIL <br /> I <br /> 0 H DEPTH TO G. 'W. : FT SAMPLING METHOD <br /> N 2 <br /> 0 # OF HOURS SINCE DEWATERING: <br /> I_.' OTHER SAMPLE: <br /> I` LABORATORY: C)Sida � i��( �� 77 SAMPLERS NAME: -E T <br /> CLOSURE IN PLACE MIXTURE: ` VOLUME: <br /> EH 23043 ( 10/89) DRAW SITE MAP ON REVERSE <br />
The URL can be used to link to this page
Your browser does not support the video tag.