Laserfiche WebLink
PARADISO CONSTRUCTION CO. <br /> GENERAL & PETROLEUM CONTRACTORS <br /> . ee <br /> � LICENSE® 259820® P.O. BOX <br /> 6397 <br /> 9220 "G" STREET OAKLAND, CA 946034603 <br /> (415) 562-5511 <br /> EXCAVATION <br /> .1 . Prior to excavating , the location of underground utilities must be <br /> determined and utility owners must be notified . This function <br /> will normally be done by the office..but if you are not sure , call <br /> the office, especially , if you are to excavate in the street or <br /> sidewalk area. <br /> 2 . All excavations 5 ' or more in depth that are to be entered , must <br /> be sloped 3/4 to 1 foot or shored . <br /> 3 .. All excavation must be inspected and monitored for ground movement <br /> on a continuing basis. <br /> 4. There .must be proper'-qualified sup ervisidn.`im"all.....times during <br /> excavation. ' :. <br /> C5. Safety provisions must be taken while installing -andremoving <br /> shorhng -the.-work *can be extremely dangerous if good practice .is <br /> ignored: _ . - <br /> :•6: Keep spoils well back 2 ' or more from the edge of all 'excavations . <br /> '7 . Effective barriers and barricades are to be used around all <br /> excavations for your protection as well as others that may want to <br /> see the work going on . Keep all others not involved in the work <br /> well back from the excavations , especially children. <br /> 8. Watch for overhead power lines , keep at least 10 ' away from these <br /> conductors . <br /> 9. Trench covers: A facility that is to be kept in operation , as <br /> many are, set up barricades and cover trenches to reduce the <br /> Possibility of a customer driving or walking into an open trench. '> <br /> When work is done for the day , insure that you leave the site "in` a <br /> safe condition . <br /> C. <br />