My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_PLAN 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
REMOVAL_PLAN 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:21:15 PM
Creation date
11/8/2018 9:43:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
PLAN 1991
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\REMOVAL PLAN 1991.PDF
QuestysFileName
REMOVAL PLAN 1991
QuestysRecordDate
11/16/2011 8:00:00 AM
QuestysRecordID
178257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARADISO CONSTRUCTION CO. <br /> GENERAL & PETROLEUM CONTRACTORS <br /> . ee <br /> � LICENSE® 259820® P.O. BOX <br /> 6397 <br /> 9220 "G" STREET OAKLAND, CA 946034603 <br /> (415) 562-5511 <br /> EXCAVATION <br /> .1 . Prior to excavating , the location of underground utilities must be <br /> determined and utility owners must be notified . This function <br /> will normally be done by the office..but if you are not sure , call <br /> the office, especially , if you are to excavate in the street or <br /> sidewalk area. <br /> 2 . All excavations 5 ' or more in depth that are to be entered , must <br /> be sloped 3/4 to 1 foot or shored . <br /> 3 .. All excavation must be inspected and monitored for ground movement <br /> on a continuing basis. <br /> 4. There .must be proper'-qualified sup ervisidn.`im"all.....times during <br /> excavation. ' :. <br /> C5. Safety provisions must be taken while installing -andremoving <br /> shorhng -the.-work *can be extremely dangerous if good practice .is <br /> ignored: _ . - <br /> :•6: Keep spoils well back 2 ' or more from the edge of all 'excavations . <br /> '7 . Effective barriers and barricades are to be used around all <br /> excavations for your protection as well as others that may want to <br /> see the work going on . Keep all others not involved in the work <br /> well back from the excavations , especially children. <br /> 8. Watch for overhead power lines , keep at least 10 ' away from these <br /> conductors . <br /> 9. Trench covers: A facility that is to be kept in operation , as <br /> many are, set up barricades and cover trenches to reduce the <br /> Possibility of a customer driving or walking into an open trench. '> <br /> When work is done for the day , insure that you leave the site "in` a <br /> safe condition . <br /> C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.