My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_PLAN 1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
REMOVAL_PLAN 1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:21:15 PM
Creation date
11/8/2018 9:43:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
PLAN 1991
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
DP & DK Investments, Inc.
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1206\PR0231175\REMOVAL PLAN 1991.PDF
QuestysFileName
REMOVAL PLAN 1991
QuestysRecordDate
11/16/2011 8:00:00 AM
QuestysRecordID
178257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
task; and noise exposures may be generated by <br /> hammering activities, and from equipment engines . <br /> 2 . Soil and groundwater sampling. Soil samples will be <br /> collected from borings, and groundwater samples if any <br /> water is encountered during drilling. <br /> Hazards : Worker exposure to the identified chemicals <br /> could occur due to inhalation of these compounds, <br /> inhalation of contaminated dust, or skin contact with <br /> contaminated soil or water. <br /> ASSIGNMENT OF RESPONSIBILITIES <br /> All personnel involved in operations who treat, excavate, trench, <br /> handle, sample, dispose of, or otherwise have a potential for <br /> exposure to site specific contaminated materials are subject to <br /> this H&S Plan. <br /> All IT personnel are responsible for continuous adherence to the <br /> safety procedures during the performance of the work. In no case <br /> may work be performed in a manner that conflicts with the intent <br /> of, or the inherent safety and environmental cautions expressed <br /> in these procedures . After due warnings, personnel who violate <br /> safety procedures will be dismissed from the site and may be <br /> I terminated. All field personnel shall be properly trained in <br /> health and safety procedures associated with handling hazardous <br /> materials and the safe operation of equipment. All on-site <br /> personnel will be trained as necessary according to the <br /> specifications set forth by 29 CFR 1910. 120 and this document. <br /> iProject Manager <br /> The Project Manager for each contractor and subcontractor will be <br /> accountable for ensuring field implementation of the H&S Plan. <br /> As required by IT Policy and Procedures 9021 . 1, the Project <br /> Manager will be responsible for informing the project' s H&S <br /> Coordinator of any changes in work plans so that issues of health <br /> and safety and project management may be appropriately addressed. <br /> A-8 <br /> iMA:ENG:9262-AppA/091291 <br />
The URL can be used to link to this page
Your browser does not support the video tag.