Laserfiche WebLink
RECEIVED <br /> D. Results of Testing/Servicing N110V 2 1 2013 <br /> Software Version Installed:VR 1.01 ENVIRONMENTAL <br /> Complete the following checklist: HEALTH DEPARTMENT <br /> X Yes No' Is the audible alar operational? <br /> X Yes No' Is the visual alar operational? <br /> X Yes - No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> X Yes ii No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> X WA <br /> X Yes ❑ No' For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br /> ❑ WA detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> X Sumprrrench Sensors; X Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? X Yes; ❑ No. <br /> X Yes ❑ No' For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e. no,mechanical overfill prevention <br /> WA valve is installed),is the overfill warning alar visible and audible at the tank fill point(s)and operating property? If so,at what percent <br /> of tank capacity does the alartrigger? 95 % <br /> ❑ Yas`i <br /> Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement arts in Section E,below. <br /> ❑ Yes' Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)n Product; ❑Water. If <br /> s,describe causes in Section E,below. <br /> X YesWas monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> X YesIs all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> L2 DISP 1-2 ANNU LAR[MODLE VR 304 X PASS <br /> L4 DISP 34ANNULAR[MODLE VR 304 X PASS <br /> L 6 DISP 5-6 ANNULAR[MIDDLE VR 304 X PASS <br /> L 8 DISP 7-8 ANNULAR[MODLE VR 304 X PASS <br /> L 10 DISP 9-10 ANNULAR[MODLE VR 304 X PASS <br /> L 12 DISP 11-12 ANNULAR[MODLE VR 304 X PASS <br /> L 13 VENT DOX[MODLE VR 208 X PASS <br /> L 14 VENT BOX ANNULAR[MODLE VR 304 X PASS <br /> L 16 87 STP SUMPANNULAR[MODEL VR 304 X PASS <br /> L 18 87 FILL SUMP ANNULAR[MODLE VR 304 X PASS <br /> L 20 91 STP SUMPANNULAR[MODLE VR 304 X PASS <br /> L 22 91 FILL SUMPANNULAR[MODLE VR 304 X PASS <br /> L 24 DIESEL STP SUMP ANNULAR[MODLE VR 304 X PASS <br /> L 26 DIESEL FILL SUMP ANNULAR[MODLE VR 304 X PASS <br /> Monitoring System Certification Page 2 of 4 12107 <br /> 2 2/21/07 <br />