Laserfiche WebLink
,F. In-Tank Gauging/SIR Equipment: X Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed If in-tank gauging equipment is used to perform leak detection monitoring. <br /> Cci!nillletethe followin checklist: <br /> Yes ❑ No. <br /> Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ Ne Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled property? <br /> ❑ Yes ❑ No- Were all items on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section H,below,describe how and when these danclencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 1❑ Check this box if LLDs are not installed. <br /> Com late the follows checklist: <br /> X Yes ❑ No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check all <br /> ❑ WA that apply) Simulated leak rate: x 3 g.p.h.; 0.1 g.p.h; ❑0.2 g.p.h. <br /> X Yes ❑ Ne Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑ No' Was the testing apparatus property calibrated? <br /> ❑ Yes ❑ -Na- For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> X WA <br /> x Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> WA <br /> x Yes ❑ No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> WA disconnected? <br /> x Yes ❑ NW For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails <br /> WA a test? <br /> X Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ WA <br /> X Yes ❑ No' I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> •In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />