My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit min mum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1 Site map andosed7 YES I 1 NO D9 <br /> 2 Sul r"*oopiss of ICC 'Service Technician andtor Installers certificate and all manufacturer training certificates for each <br /> WSW inslBut"or testing any component that is repaved or replaced Ensure a copy of the 'Site Hearth and Safety <br /> Plan'is availalAe on the jobsite as required by Title 8. <br /> 3 Detailed description of work lobe completed. List components to ba repaired or replaced and attach a diagram drawn <br /> to scale Showing location of repairs andror replacernents. tf repairing a component, describe haw this well be done. (If <br /> adds piping. UDC's, or other UST equipment, or performing tank top upgrade. use the UST Installation Application <br /> pages 4-8 as necessary for a tamely plan review): <br /> fl CGS <br /> 4 List of equipment to be used manufacturers specification Sheets showing third-party approval); <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.