My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans& applications as originals will be retained by EHD) <br /> I Site map enclosed? YES [I NO DSC <br /> 2. Submit copies of ICC Service Technician andtor Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the'Site Health and Safety <br /> Plan- is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaited or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. It repairing a component, describe how this will be done, (N <br /> Widina pong, UDC's, or other UST equipment, or performing tank too upgrade, use the UST Installation Appk"W <br /> pages 4-8 as necessary for a timely pian review): <br /> lD <br /> 3 vtnl/1 Jfi9 dryer/ Iib j¢ory �;'��S lGz <br /> c� 7— T;H f Ts T J k 1 -"'r9E30j�) <br /> 2� <br /> 72 k Call, sr-,44`1- 0o, S b <br /> .5 O � r w ri-+Lt. CiyJ SE it-y}-Q 4 <br /> 4. List of equipment to be used(Attach manufachuefs spedflcetion sheets showing third-party approval) <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.