My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�ar�pnons:(cua)voa sazvrar:�caoa-sgoarreo:vvww.s�mvvraany <br /> RETURN TO COMPLI NCE CERTIFICATION <br /> r_ D <br /> AnyIM NOR violations noted in the"Notice to Comp in the attached Inspection Report must be 052011 <br /> corrected within 30 days of receipt of this inspection. This certification form must be sub mitp the <br /> Environmental Health Department(EHD)address at a top of this form within 30 days of rete k"(WiB'„-1� <br /> Irl; rr.:1 HALT <br /> Inspection Report. HSC 25404.1.2(c)(1) 'VICES <br /> H <br /> All corn . ns to ofh vio noted in the attach Inspection Report (IR) or Continuation Form, or <br /> disputes to any violations, are o be submitted using is certification and returned to EHD within 30 days <br /> unless otherwise specified in the Inspection Report. SC 25185(c)(3) <br /> Note: All EHD staff time associated with bill g to comply by the above noted dates will be <br /> billed at the current hourly rate. <br /> For this certification to be cotllp�te the operator of the site must include: <br /> • A statement documenting what corrective accftio ware taken or will be taken for each violation <br /> • Copies of sample resufts/manifests/training r s/other appropriate paperwork, and/or photos <br /> verifying corrections <br /> . Operator's certification 1 <br /> inspection Date: November 4, 2011 — Inspected By:Garrett Backus <br /> Facility Address: 1916 E March Lane EPA IDS: <br /> I certify under penalty of law that: � <br /> 1. I +ave corrected the violations specified in tf Inspection Report from the above-mentioned <br /> insriection date. <br /> 2. 1 have oersonaity examined the following do4imentation submitted as proof of compliance FOR <br /> EACH VIOLATION and I believe the info on to be true, accurate, and complete: <br /> a <br /> Photos .��apervrork Statement <br /> 1 <br /> 3 1 am authorized to submit this certification C1 behalf of the Respondent. <br /> 4. 1 am aware that there are significant penalti4 for submitting false information, including the <br /> possibility of a fine and/or imprisonment for" violations. (HSC 25191) <br /> Name: KA_9AW �T �_Tidw M G'I tL <br /> Signa!ure 4r �"f Date_ - 3 V.-f- I - <br /> EHD 22-02-005 Rev 09/17 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.