My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1916
>
2300 - Underground Storage Tank Program
>
PR0527728
>
COMPLIANCE INFO 2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:27:18 PM
Creation date
11/8/2018 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0527728
PE
2351
FACILITY_ID
FA0018792
FACILITY_NAME
MARCH AND BIANCHI CHEVRON
STREET_NUMBER
1916
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09603029
CURRENT_STATUS
01
SITE_LOCATION
1916 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARCH\1916\PR0527728\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
9/28/2017 8:32:42 PM
QuestysRecordID
3652760
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECE�VEV <br /> F. In-Tank Gauging/SIR Equipment: X Check this box if tank gauging is used only for inventoryA�,P`_y�► �/ <br /> ❑ Check this box if no tank gauging or SIR equipmennt'i�a installed. 2 2015 <br /> This section must be completed it in-tank gauging equipment is used to perform leak detection monitoring. �,•V'R NM <br /> M <br /> i checklist:" Has all input wiring been inspected for proper entry and termination,including t' Were all tank gauging probes visually Was accuracy of system product level readings tested?' Was accuracy of system water level reaWere all probes reinstalled properly?Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): i I Check this box if LLDs are not installed. <br /> Complete the followinachecklist: <br /> X Yes _; No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> N/A that apply) Simulated leak rate: x 3 g.p.h.; ❑0.1 g.p.h; CI 0.2 g.p.h. <br /> X Yes ❑ No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> X Yes ❑ No' Was the testing apparatus properly celwratad? <br /> Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> X WA <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off it the LLD detects a leak? <br /> WA <br /> x Yes ❑ No' For electronic LLDs, tices the turbine automatically shut off it any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> x Yes ❑ No' For electronic LLDs,does the turbine automatically shut off 9 any portion of the monitoring system malfunctions or fails <br /> N/A a test? <br /> X Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> X Yes No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> 'In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments:THE DIESEL PLLD DID NOT PASS. IT WAS REPLACED ON 12/2/2014. NEED TO RETEST <br /> Monitoring System Certification Page 3 of 4 1410? <br /> 3 <br /> 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.