Laserfiche WebLink
Sent By: USA PETROLEUM WAREHOUSE; <br />909 622 1002; Nov -4-n4 10:03AM; Page 313 <br />TDBY ARGANDONA �%j PAGE 03 <br />CONI & CON27 SPILL <br />CONTAINER ASSEMBLIES ACTumm <br />FOR 2 POINT SYSTEMS <br />SPECIFICATIONS: <br />•E6L01EEe DUNA N, RUBBER <br />' COM044904M0N R/NEa DUCTILE IRON <br />•*PKL CONTAN/ERr BLACK CROSS•LINK <br />POLYETHYLENE. <br />'VRAIN VALVE AEE'1/--: 36876 HARD COAT <br />' ANODIZED ALUMINUM. <br />FLANGE N KII!aGNW RI01101 DUCTILE IRON <br />•OVAL DRAIN FLANGE: DUCTILE IRON, <br />MPRP-10 <br />Rubbw Bo4owa <br />CON2 <br />PIOOutt SPIN <br />CorftOW Aaaambty <br />RP12-PUSH <br />Drain Valva Aaawnoy <br />STP -22. Oval <br />Drain Fienpa <br />PIN CON2 <br />Product <br />FEATUMIs <br />'THE SPILL CCWTAWERS ARE PRE -ASSEMBLED AT THC <br />FACTORY FOR FRSE OF INSTALLATION. <br />• MADS FOR A CONTRACTOR FRIENDLY INSTALLATION <br />• ONCE THE TANK RISER 18 MEASURED AND INSTALLED <br />THE DROP TUBE ODES IN PLACC. REMOVE THE <br />CONTAINMENT FROM THE BOX PUT IT ON THE MISER <br />SCREW IT ON AND TORQUE fT TO 186-200 FOOT LBS <br />STP -3i <br />4 pc. Segpwa <br />Reintoroamwrt PLa <br />STP -17_ O W Fh" <br />Compr466ion RkV <br />MPRP-1 C <br />Rubbw-BeNow4 <br />CONI <br />vow Spo <br />Contain w Asssmey <br />STP -24, Round <br />Grein Hangs <br />PIN_CON9 <br />/V 114 <br />VSIp01' <br />THIS UNIT 18 TOTALLY FRIS ASSEMIM iD AT TN! <br />FACTORY FOR EAI! OF itwALLATION. <br />(AE EHOWN NI THE CNOEE-EftTION AEOVE) <br />STP -31 <br />4 PC. Badow4 <br />RokAaownem Pm <br />3TP-16. Roww Flange <br />C&npv Ion Ring <br />C <br />