Laserfiche WebLink
rvi-onitoring System Certification `� <br />Site Address: 2132 MARIPOSA ROAD Date of Testing/Service: 05/03/2004 <br />F. In -Tank Gauging / SIR Equipment <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Q Yes <br />ON, <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Q Yes <br />F-1 No <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑No • <br />Was accuracy of system product level readings tested? <br />❑No • <br />❑No• <br />Was accuracy of system water level readings tested? <br />rEEE]Yees. <br />❑Ne. <br />Were all probes reinstalled properly? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ No' <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />In the Section H, below, describe how and when these 0eticiencies were or Will De comemea. <br />G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br />cnnlnlete the followino checklist: <br />[flYes <br />DING' <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: Q 3 g.p.h ❑ 0.1 g.p.h ❑0.2 g.p.h <br />M Yes <br />❑ No • <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />M Yes <br />❑No • <br />I <br />Was the testing apparatus property calibrated? <br />❑ Yes <br />❑No • <br />❑ N!A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑No' <br />© N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />ONO • <br />❑x N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ Yes <br />❑No' <br />M N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ Yes <br />❑No' <br />Q N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Yes <br />❑No • <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />In the Section H, below, describe how and when these deticienaes were or will be correctea. <br />H. Comments: <br />Page 3 of 3 Based on CA form dated 03/01 <br />