Laserfiche WebLink
D. Results of Testing/Servicing <br /> Seftware Version Installed- <br /> Complete <br /> nstalled:Com lete the fonowin checklist: <br /> es ❑ No* Is the audible alarm operationaP <br /> ;tiaes ❑ No* Is the visual alarm operational? <br /> es 0 No* Were all sensors visually inspected,functionally tested,and confumed Operational? <br /> es Q No* Were all sensors inaWled at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with thou proper operation? <br /> es 0 No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> 0 N/A operational? <br /> es Q No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Q N/A monitoring system detects a leak,fails m operate,or rs electrically disrn tied? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) L'NStmp7rench S 04VCPea r Can ''nment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure) connection?'fres; ❑No. <br /> Yea 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> Q N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audib a tank <br /> fill tvnt(s)and operating properly? If so,at what percent of tank capacity does the alarm tri er7 % <br /> Q Yes* VeNo Was any motdtotmg equipment replaced? If yes,identify specific sensors,probes,or other equipment=Placed <br /> and list the manufacturer name and model for all replacement parts in Section F,below. <br /> Q Yes* 12,No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)Q <br /> product; Q W avy. IS y,s,describe causes in Section E,below. <br /> ❑ No* Was monitoring tem set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Ycs ❑ No* Is all monimrin equipmento ational per manufacturer's specifications? <br /> *to Section E below,describe how and when these deficiencies were or will be corrected. <br /> E- Comments- <br /> Page 2 of 3 03101 <br />