My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> 9 <br /> M <br /> Q <br /> Attestation No. P 141209 <br /> Juan Delgado <br /> n�aoUVER) (IMMUY Walton Engineering <br /> VR-102- <br /> Attended Installation Training for EVR Phase I by OPW, Inc, <br /> On: 12/18/2034 UP Date: 12/18/2016 <br /> Completion of this training course does not create a warranty or guaranty by OPW of your <br /> installation and/or maintenance of nozzles,vapor recovery systems and EVR PHASE I <br /> systems. This training corse does not eliminate the need to strictly adhere m manufacturer <br /> instructions and procedures when Installhg and maintaining nozzles, vapor recovery systems <br /> and UR PHASE I Systems. All nozzles,vapor recovery systems and EVR PHASE 1 Systems <br /> must be installed and maiitalned in accordance with manufacturer inductions and <br /> procedures. Attestation applies ONLY to tested named individual. <br />
The URL can be used to link to this page
Your browser does not support the video tag.