Laserfiche WebLink
0 <br /> 9 <br /> M <br /> Q <br /> Attestation No. P 141209 <br /> Juan Delgado <br /> n�aoUVER) (IMMUY Walton Engineering <br /> VR-102- <br /> Attended Installation Training for EVR Phase I by OPW, Inc, <br /> On: 12/18/2034 UP Date: 12/18/2016 <br /> Completion of this training course does not create a warranty or guaranty by OPW of your <br /> installation and/or maintenance of nozzles,vapor recovery systems and EVR PHASE I <br /> systems. This training corse does not eliminate the need to strictly adhere m manufacturer <br /> instructions and procedures when Installhg and maintaining nozzles, vapor recovery systems <br /> and UR PHASE I Systems. All nozzles,vapor recovery systems and EVR PHASE 1 Systems <br /> must be installed and maiitalned in accordance with manufacturer inductions and <br /> procedures. Attestation applies ONLY to tested named individual. <br />