My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/8/2018 9:44:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MARIPOSA\2132\PR0231669\COMPLIANCE INFO\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/15/2017 6:48:05 PM
QuestysRecordID
3131588
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR OCT 18 2016 <br /> (Submit minimum of 3 sets of plans 6 applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES W NO[] ENVIRONMENTAL HEALTH <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer traininggc€ftifiC�t�Sfbr'88ch <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Sawcut concrete 7x7on the existing 87 main turbine sump. Remove existing turbine and install 2 turbines <br /> in the 87 tank and replace the existing turbine in the 91. Replace existing MLLD's with new PLLD's for the <br /> UST's. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.