Laserfiche WebLink
Name or supplier,Owner or Dealer Address No.and Straet(s) City state Date of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> Z Jb X Station Chart <br /> Soo(t'� .140M By most accurate � �3 <br /> m Nominal Capacity "`' capacity chart available / ❑ Tank Manufacturers Chart <br /> U) /� r Identity by position Gallons Gallons Company Engineering Data <br /> m V <br /> Is there doubt as to True Capacity? / p,}{�� ❑ (� El ChaRS supplied with tCr«P�„ 'P <br /> hBrand and Grade See Section"'DETERMINING TANK CAPACITY" El Other <br /> }v p <br /> 17. FILL-UP FOR TEST 3 , r ��` 2a ��r _ p{y Slick Readings <br /> ! Total Gallons <br /> to I/#in. Gallons ea.Reading <br /> Stick Water Bottom 3 l <br /> before Fill-LipInventory �f <br /> to'/a in. Gallons <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter ?! Product in full tank(up to fill pipe) <br /> �DOO <br /> ao 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> I 00> See manual sections applicable.Check below and record procedure in log(26). Stage I <br /> zero <br /> O tv M ❑ Water in tank ❑ High wate�table in tank excavation ❑ Liners)being tested with LVLLT El Stage II <br /> Onom C1 fa�ftt 1�' �/�`. <br /> rro I � 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> N19. TANK MEASUREMENTS FOR Is Today Warmer?):ff Colder?13 F Product in Tank— F Fill-up Product on Track F Ex)edea Change T of - ] <br /> la <br /> TSTT ASSEMBLY <br /> CnI <br /> Bottom of tank to Grade*.._. _......, / " 22. Thermal-Sensor reading after circulation J <br /> IF <br /> 1 Add 30"for 4"L ................. _ d q is Nearest <br /> Add 24"for 3"L or air seal ....... 23. Digits per IF in range of expected change <br /> / „ <br /> Total tubing to assemble Approximate ........ digits ,r <br /> 20. EXTENSION HOSE SETTING 24' /0 X Uv _ ^ �� gallons <br /> total quantity in coefficient of expansion for volume change in this tank t r ; <br /> Sank top to grade' <br /> ;...... „ full tank(16 or 17) involved product per'F �, it <br /> Extend hose on suction tube 6"or more -- <br /> f'; <br /> below tank top ..................................... f .J 25. �' U "� dr ; °C ) — I .7 , j This is <br /> volume change per IF(24) Digits per'F in test Volume change per digit. test <br /> If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31, 34. 38.NET VOLUME 39. <br /> LOG OF TEST PROCEDURES PRESSURE VOLUME MEASUREMENTS(V) TEMPERAURE COMPENSATION CHANGES ACCUMULATED <br /> CONTROL RECORD TO.003 GAL USE FACTOR(a) EACH READING CHANGE <br /> d a e Level 32. 35. 36. 37. Temperature ,u High t.evel record <br /> 27. 2$ 2$ Standpipe <br /> Inches Product in Product Change Computation Adjustment ramal End.gapeWE <br /> WE Record details of setting',up Beading Graduate Replaced(-) Thermal Higher+ (e) x (al- Volume Minus <br /> and running test.( Beginning Levet to Sensor Lower- Expansion+Use full Ho. At La.LOW computs <br /> Expansion(+J orE length of line if needed.) of which Before Attar Product Reading (c) Contraction- Contraction(-) change per Hour <br /> TIME l2� E Reading Restored Reading Reading Recovered(+) 4r33(V)-837(7) (NFPII cnwm) <br /> - l� .J r .7. T '� .. r' �fw'= ,/ .,lK�' I J s.f r`• <br /> �•',�, - .J �-S 'fin~ 1, 105 7l",✓ ,LJ �✓ 1 V J�11�� 'F <br /> 71� " ^�':� ✓:\]� <br /> 2.-55 7 r7 <br /> ✓� <br /> •�`~ L 4 V 4 ll -+' �` I V J, t4 n `."5 •V t <br /> ' l �5 t5 ` ^ �'-+ •1._+� f f <br /> •T i ( � 'i+d'� f �V...� ti � � ^t' J�'^� S^. i I i � �'C�V ! ..�,.�.14 - ✓� <br /> tq <br /> r <br />