Laserfiche WebLink
110, mw <br /> SOARO OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT SERVING <br /> James Culbertson, P(es. <br /> City of Lodi <br /> AnIhonetl Patricia nnuccl. Secy. 1601 East Hazelton Avenue, P. O. Boz 2009 Sen Joaquin County <br /> Anthotls V Ven SOronaen - <br /> Fart Plmentel City of Escslo <br /> n <br /> Fern ugbea Stockton, City of Manteca <br /> Daniel L. Flores 209/466-6761 Cit of Ripon <br /> City of <br /> Stockton <br /> John O. Mast, M.O. City of Tracy <br /> William J. Wade Jo01 Khanna, M.D., M.P.H., District Health Officer San Joaquin County <br /> Mary Anna Love San Joaquin County <br /> Facility Name ✓)1 <br /> ooCe&- 1S%R1& 1i/Qti :P, <br /> C&117 - <br /> Address OOC) lwel1011v /five lyxlkl'�� <br /> Date �� a1��__ Inspector <br /> MONITORING ALTEP,NA.TIVE ,R7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the ligtlit: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> i <br /> This monitoring alternative shall include: <br /> ,,' An precision test on tank and piping. <br /> lank gauging performed as follows: <br /> Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours). <br /> (For example: level measured and recorded Friday night before <br /> / locking and again on Monday morning before opening. ) <br /> ✓ If liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> completed by the dates specified. <br /> 1 . Precision test(s) must be performed by Y--25-9` and results submitted to this <br /> office within 30 days of the test. <br /> 2. Tank gauging must be started immediately. (See instructions above). <br /> If the above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> EH 23 002 4/86 <br />