My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MELLON
>
800
>
2300 - Underground Storage Tank Program
>
PR0231686
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:41 PM
Creation date
11/8/2018 9:45:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0231686
PE
2381
FACILITY_ID
FA0003691
FACILITY_NAME
MBM, Manteca
STREET_NUMBER
800
STREET_NAME
MELLON
STREET_TYPE
AVE
City
MANTECA
Zip
95337
CURRENT_STATUS
02
SITE_LOCATION
800 MELLON AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MELLON\800\PR0231686\COMPLIANCE INFO PRE 2016 .PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
9/12/2016 8:28:03 PM
QuestysRecordID
3189116
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRI=N MON-ITbREI;G PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING pRC�JGRAitii <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division. phone (209) 168.3420 within 30 days of am changes to the monitoring <br /> procedures, artless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CC?- <br /> Facility <br /> CRFacility Name ( Q {(4, r L , '.1 F„ 4-r r Pr I r P s <br /> Facility Address A oo ✓r 1e (( , q�,r M4n 1 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank_ – - - FA 5; /Llo <br /> Piping `'Psi r ao/ <br /> C. Describe the locat;on(s) where the monitoring will be penormed (factity plot plan <br /> should be attached): <br /> S!- M <br /> V 7— <br /> I e� k ds+s <br /> D. List the name(s) and title(s) of the people responsible for pefforming the monitoring <br /> and/or maintaining the equipment <br /> Ss.Fitt ui.t.'t 0 'i' F✓ t s P'�r <br /> E. Reporting format for monitoring: — <br /> Tank_ Sc c /1 r c,(,-Cv 4y S <br /> Piping Sc r A " td ,il <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the man vers' maintenance schedule <br /> but not less than every L'months: rt C' <br /> G. Describe the training necessary for the operatio of UST system. including piping, <br /> and the motiitorins equipment: ,�{,p/ 54, � S ✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.