Laserfiche WebLink
v `r'- <br /> SOARD OF TRUSTEES SAN JOAQUIN LOCAL HEALTH DISTRICT <br /> James Culbertson, Pres. SERVING <br /> Patricia E. Vannuccl. Selly. City of Lodi <br /> Anthonelte van Spron,en 1601 East Hazelton Avenue, P. O. Box 2009 San Joaquin County <br /> Earl Plmenlel Stockton, California 95201 City of E,calon <br /> Fern eupbee City of Manteca <br /> Daniel L. Flores 209/466-6781 City of Ripon <br /> John 0. Mast, M.D. City of Stockton <br /> William J. Wade Jopl Khanna, M.O., M.P.H., District Health Officer City of Tracy <br /> Mary Anna LoveSan Joaquin County <br /> San Joaquin County <br /> Facility Name ZQK, <br /> Address 0C)49 0 /tI6G4- o n/ 147/C, Cog- <br /> Date of Inspection Inspector <br /> MONITORING ALTERNATIVE H7 <br /> Limited to undernround storage tanks which have infrequent inputs and withdrawals and <br /> where the liquic: level in the tank can be measured to an accuracy of +5 gallons or less <br /> when the tank is half full . <br /> This monitoring alternative shall include: <br /> Annual <br /> � precision test on tank and piping. <br /> k Tan/k gauging performed as follows: <br /> (/ Tank must be capable of being secured to prevent unauthorized inputs and <br /> withdrawals. <br /> Tank must have no inputs or withdrawals for at least a 48 hour period <br /> (2 days) at the end of consecutive periods lasting up to 7 days. <br /> (For example: tank in use Monday through Friday, then locked <br /> over weekend) . <br /> Liquid level measurements are taken at the beginning and end of the <br /> monitoring period (lasting at least 48 hours) . <br /> (For example: level measured and recorded Friday night before <br /> locking and again on Monday morning before opening. ) <br /> �f liquid level varies more than 1% of the tank volume or 5 gallons, which <br /> ever is less , between measurements , an unauthorized release shall be <br /> assumed to have occurred and shall be reported to the local agency within <br /> 24 hours, as per Article 5, Sect. 2652 of the regulations and further <br /> evaluations shall be performed to verify or disprove the variations. <br /> Implementation of the monitoring alternative requires that the following circled items be <br /> com eted by the dates specified. <br /> 1 , Precision test(s) must be performed by —�idnd results submitted to this <br /> office within 30 days of the test. <br /> th2. /Tank gauging must be started immediately. (See instructions above). <br /> �Ifthe above compliance dates cannot be met, contact this office prior to the specified <br /> date. <br /> 4/86 UGT 3 I <br />