Laserfiche WebLink
DoUBLEWALL VAPOR I • CONTAINMENT OL <br /> 11 I IC-AB UNiBox TMHYDROSTATIC & VACUUM MONITORED FieERGLAss Boxv <br /> a <br /> v <br /> n <br /> 0 <br /> a <br /> Adjustable electronic Durable rigid Rack system <br /> v <br /> monitor housing penetration fittings structural <br /> (Sensor not included) support <br /> Interstitial <br /> 3 Fluid Access covei� <br /> Included �— Level flange <br /> Ships with Positive rack <br /> Combination concrete <br /> Gauge Factory anchoring <br /> Installed for <br /> continuous <br /> monitoring <br /> Recommended: <br /> RS-500-3S or -5S <br /> Rack system not shown <br /> New Reinforced Doublewall <br /> fiberglass manufacturing process allows Reinforced edges and <br /> liquid fill time to be measured in minutes!! lower corners are now <br /> thicker than before to <br /> prevent damage <br /> Third Party Approved, AB-2481 Compliant: <br /> HYDROSTATIC 13500-D-AB <br /> VACUUM B500-D-VAC-AB Required: <br /> B-33-D, B-17-D <br /> U� UL Approved Sumps Optional 3", 1" & 3/4" flexible <br /> double ended fitting <br /> .r Access panel independent of vent riser <br /> Patent#.6,823,886 <br /> 1. IRAVO SYSTEMS, MIM.t• <br /> BRAVO 323/888-4133 Fax: 3233/888-4123 INE-ma292infol@sbaravo commmewww sbravo co8m8 'PEI' <br /> SYS TEM i �n.q.•rM""` <br /> B-500-JP D-AB DS-6-05 <br />