My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:54 PM
Creation date
11/8/2018 9:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL 2007.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> These instructions describe the installation of Veeder-Root Vacuum Sensor System in a STP sump.Vacuum <br /> sensors can be installed in a pump sump to monitor the: <br /> • Double-wall product line's interstitial space <br /> • Double-wall vapor return line's interstitial space <br /> • Double-wall tank vent line's interstitial space <br /> • Double-wall tank's interstitial space <br /> • Double-wall sump's interstitial space <br /> Hardware Requirements <br /> • TLS-3501350R with version 24C or later software <br /> • At least one SmartSensor/Press Module <br /> • Line leak(PLLD or WPLLD),x w/o line leak,a Pump Sense and a 4-Relay module is required for STP control <br /> • Siphon manifolded tank requirements: <br /> -The Red Jacket STP requires a secondary siphon assembly(V-R P/N 410071-002). <br /> -The Quantum STP comes with two siphons as standard equipment-no additional parts are required. <br /> -FE pumps require a secondary siphon kit (FE P/N 402.507-930). <br /> Available K is <br /> Vac sensor kits are available in several configurations: <br /> 2,3,or 4 Vac SensorNac Float pre-assembled kits- includes mounting hardware,tubing/connections,and cables <br /> (for one sump) <br /> • 2 Vac Sensor kit w/steel float,3 Vac Sensor kit w/steel float, or 4 Vac Sensor kit w/steel float <br /> • 2, 3,or 4 Vac Sensor kit w/fiberglass 4, 6,8,or 10'float (includes relief valve) <br /> • 2,3,or 4 Vac Sensor kit w/o tank interstitial sensor <br /> Individual kits(requires Vac SensorNac Float field assembly) <br /> • Mounting kit- 1 required per sump <br /> • Secondary piping vacuum monitoring system kit- leach required for product line,vapor recovery line,or sump <br /> interstice monitoring-includes mounting hardware,tubing/connections,and cables <br /> • Interstitial sensor kit for steel tank-includes Vac Sensor,mounting hardware,tubing/connections,riser cap,and <br /> cables <br /> • 4', 6, 8,or 10'diameter fiberglass tank Interstitial sensor kit-includes Vac Sensor, mounting hardware,tubing/ <br /> connections, riser cap,relief valve,and cables. NOTE:you do not need to order an additional relief valve for a <br /> fiberglass tank installation. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.