My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORADA
>
4219
>
2300 - Underground Storage Tank Program
>
PR0524617
>
INSTALL_2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:08:54 PM
Creation date
11/8/2018 9:46:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007
RECORD_ID
PR0524617
PE
2351
FACILITY_ID
FA0016523
FACILITY_NAME
RALEYS FUEL STATION #356
STREET_NUMBER
4219
Direction
E
STREET_NAME
MORADA
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12429017
CURRENT_STATUS
01
SITE_LOCATION
4219 E MORADA LN
P_LOCATION
01
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\M\MORADA\4219\PR0524617\INSTALL 2007.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Veeder-Root Line Leak Apo <br /> ation Guide <br /> Precision Testing Frequencies <br /> On-Demand (D) <br /> Testing can be initiated manually through the TLS Console or by programming a date and time into memory. <br /> Auto(A) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recommence six <br /> months from the date of the last passing test. <br /> Monthly(M) <br /> Tests will run repetitively until a passing test is achieved.Once a passing test is achieved,testing will stop and recommence the <br /> first calendar day of the next month. <br /> Repetitive <br /> Tests will run repetitively according to pre-programmed time intervals. <br /> Refer to the matrix below to determine which precision testing option best meets your needs: <br /> TESTING OPTION 0.2 GPH TESTS 0.1 GPIH TESTS <br /> ULTIMATE TESTING D.M,R D,A,R <br /> RISK MANAGEMENT D,M,R D,A <br /> BASE COMPLIANCE None D,A <br /> PLLD Accessories and Spare Parts for Existing TLS-350 <br /> Series Systems <br /> The following PLLD accessories and spare parts are available: <br /> MODEL <br /> 331014-001 SWIFTCHECK VALVE(INSTALLS IN THE PUMP'S MECHANICAL LEAK DETECTOR PORT) <br /> 84749D-109 SIX INPUT PLLD INTERFACE MODULE(THROUGH-HOLE MOUNT)-REPLACEMENT ONLY <br /> 847490-110 SIX INPUT PLLD INTERFACE MODULE(SURFACE MOUNT) <br /> Note: <br /> The through-hole mount,six input PLLD Interface Module(PM 847490-109)is for repair/replacement in existing consoles only. <br /> Spare 847490-109 modules are shipped with complete installation and programming instructions and not pre-installed in con- <br /> soles.Customers that require replacement of PLLD Interface Modules should replace like for like,i.e.through-hole mount PLLD <br /> Interface Modules for through-hole mount PLLD Interface Modules.Surface mount PLLD Interface Modules are NOT inter- <br /> changeable with through-hole mount PLLD Interface Modules. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.