Laserfiche WebLink
7UL-04-2007 13:35 Service Station Systems 408 938 8888 P.03 <br /> Monitoring System Certification-Pa+of 3 . <br /> Site Address: 4219 Morada Ln. Date of Testing/Servicing. (e <br /> D. Results of Testing/Servicing <br /> Software Version Installed• t7-7 <br /> Complete the following checklist: <br /> Yes 1 0 NO Is the audible alarm operational? <br /> Yes 0 No* Is the visual alarm operational? <br /> Yes ❑ No* Were all sensors visually inspected, functionally tested, and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* if alarms are relayed to a remote monitoring station, is all communications equipment(e.g. modem) <br /> ID N/A operational? <br /> A Yes 11 No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically discomiected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) b Sump/Trench Scissors; N Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Q Yes 0 No <br /> 1p Yes a No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> ❑ N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating properly? if so,at what percent of tank capacity does the alarm trigger? 9d . % <br /> 0 Yes* 1 No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement arts in Section E,below. <br /> 0 Yes* !�No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> 0 Product;0 Water, if yes,describe causes in Section E,below. <br /> Yes 0 No* Was monitoringsystem set-up reviewed to ensure proper settings? Attach set-upreports, i a licable. <br /> "l Yes 0 No* is all monitoring equipment operational per manufacturers specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Y �-- <br /> 7S93C�- 1� r ;� 43 _ 3cl <br />