Laserfiche WebLink
UL/ULC Listed Red Thread® IIA Piping System <br /> Lowest Total Cost Ownerships <br /> Benefits of [Material Cost + Installation Cost] = System Life <br /> Fiberglass Piping <br /> Maintenance cost and replacement cost not required with RED THREAD IIA piping system. <br /> Thirty Year • Outstanding Corrosion <br /> in Underground W a r r a n t y * Resistance — RED THREAD IIA <br /> With over 40 piping systems resist internal and <br /> Fuel Applications <;)u <br /> years proven external corrosion from hazardous <br /> performance in soils, fuels and other corrosive <br /> TIME TESTED the marketplace, fluids. <br /> nderwriter ' s <br /> • 30-Year Warranty Laboratories, Inc. • Quality Assurance — FGS <br /> and Underwriter's Laboratories Smith Fibercast quality assurance <br /> • Installed since 1964 Canada (UL/ULC) Listed RED procedures meet or exceed the <br /> THREAD IIA pipe, fittings and test requirements of UL/ULC. <br /> adhesive carry a 30-year warranty. <br /> • Never been removed due The product is warranted to be • Permeability — RED THREAD <br /> to fuel incompatibility free from defects in material and IIA permeability resistance <br /> workmanship—and against internal greatly exceeds UL allowable <br /> •Total immersion testing and external corrosion—when used permeability. <br /> in fuels for underground transportation of <br /> 2004 UL 971: <br /> fuels. <br /> Primary - 1 gm/m2/day <br /> • Case History G7301 <br /> • Leak Prevention — Sump (0.053 gal/100 ft. of 2" pipe, <br /> entry/termination fittings provide 30 days) <br /> positive seal at the sump to help Secondary - 4 gm/m2/day <br /> LOWEST TOTAL COST prevent leaking of underground (0.213 gal/100 ft. of 2" pipe, <br /> OF OWNERSHIP fuel in or out of the sump. This 30 days) <br /> fitting also helps provide Class 1995 UL 971: <br /> • No reinstall costs due I (leak prevention) protection Primary - 4 gm/m2/day <br /> which complies with California's (0.213 gal/100 ft. of 2" pipe, <br /> to fuel incompatibility p 30 days) <br /> requirement for continuous <br /> interstitial monitoring of the piping Secondary - 24 gm/m2/day <br /> • Homogenous system: no system's secondary containment. (1.278 gal/100 ft. of 2" pipe, <br /> liner, no bladder 30 days) <br /> • Exceptional Flow <br /> A TRUE PIPE IN A PIPE Characteristics - Two-inch <br /> RED THREAD IIA pipe has the `�- <br /> • Interstitial space largest I.D. (2.235") in the fueling <br /> communication industry—allowing you to sell twice <br /> the fuel per foot than any 11/2" <br /> • Leak prevention, not flexible product on the market. <br /> leak detection Three-inch RED THREAD IIA <br /> fiberglass pipe has a nominal 3.36" Old vs New- Pipe in the foreground was <br /> installed in 1973 and removed 27 years <br /> INSTALL /TBURY I.D.; four-inch pipe has a 4.36" I.D. later when the station closed. <br /> • , , <br /> FORGET IT.! <br /> 'Please review FGS Smith Fibercast's written warranty to determine the terms and conditions. <br /> 2 <br />