My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 11:01:14 AM
Creation date
11/8/2018 9:46:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MYRTLE\2849\PR0538822\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
4/13/2018 5:07:30 PM
QuestysRecordID
3854464
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> 7. Using the automatic shutoff device manufac- To operate properly, the ball float valve must be <br /> turer's suggested procedure, examine the drop properly installed, positioned at the correct height <br /> tube and shutoff valve to determine if product inside the tank and compatible with UST configu- <br /> flow will be completely shut off at 95 percent of ration. <br /> tank capacity. Make any adjustments necessary <br /> to ensure that flow will be completely shut off 7.2.2 Purpose. The purpose of this inspection is <br /> when the tank is no more than 95 percent full. to verify that the ball float valve is installed prop <br /> erly,operates as designed,and is set to restrict flow <br /> S. After inspection of the automatic shutoff device, when the tank is no more than 90 percent full. <br /> reinstall the drop tube. <br /> `J <br /> Ilk. rs. <br /> O <br /> FIGURE 7-1. Check the drop tube and flapper for dam- 3 <br /> age. Make sure that the flapper moves freely and will <br /> move into the product flow path. <br /> 7.1.7 Pass/Fall Criteria. If the automatic shut- FIGURE 7-2. Ball float assembly showing the ball in the <br /> off device functions as designed and complete open position. The ball will float and cover the vapor <br /> shutoff of product flow is able to occur when the path if the product rises above the level of the cage. <br /> tank is no more than 95 percent full, the automatic <br /> shutoff device passes the inspection. 7,2,3 Inspection Equipment. Test equipment <br /> If the automatic shutoff device does not function shall include: <br /> as designed or complete shutoff of product flow . equipment to remove the vent restriction device; N <br /> is unable to occur until the tank is more than 95 <br /> percent full, the automatic shutoff device fails the • tape measure. <br /> inspection. 7.2.4 Description of Inspection. The ball float <br /> 7.2 Ball Float Valves. The committee recommends valve assembly is removed from the tank, inspect- <br /> that ball floats be removed from USTs as overfill preven- ed for proper operation and measured to ensure that <br /> tion devices and another method of overfill prevention be the ball float assembly is the proper dimension to <br /> installed. restrict flow into the tank when it is no more than <br /> 90 percent full. <br /> 7.2.1 General. Ball float valves are designed <br /> to restrict product flow when product in the tank 7.2.5 Preparation. Refer to the manufacturer's <br /> reaches a certain level by restricting vapor flow tank chart for the capacity in gallons, the diameter <br /> from the tank tillage.When vapor flow is restricted, and the volume of product with respect to product <br /> pressure builds in the tank tillage, slowing the flow level. <br /> of product into the tank. <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.