Laserfiche WebLink
Stacy Rivera [EH] <br /> From: Joseph Bagley <joe@bag leyenterprises.com> <br /> Sent: Monday, November 12, 2018 2:48 PM <br /> To: Stacy Rivera [EH] <br /> Cc: Elena K. Manzo [EH]; 'Ann Marie Addler'; 'Rod Tompkins'; 'Darla Smith'; 'Fuller, Jeffrey' <br /> Subject: SR0079170 &Additional Work at SJRTD <br /> Hello Stacy, <br /> We currently have an active permit in hand, SR0079170, to repair the diesel leak inside the transition sump in the filter <br /> room on the UST system. As you are aware we have identified an additional problem at RTD concerning#1 &#2 turbine <br /> sumps. In as much as both#1 &#2 diesel systems will be down for the duration of the work noted in SR0079170 and <br /> would also be down for the duration of the work to repair the sumps, we would like to work on the#1 &#2 turbine <br /> sumps simultaneously with the work on SR0079170. Doing so would shorten the overall length of time that RTD's buses <br /> would have to be "wet hosed" thus substantially reducing overall costs. In short, we would like to add the scope of work <br /> for repairs of the#1 &#2 turbine sumps to SR0079170 (NOTE: at this time we do not anticipate needing an extension of <br /> time for SR0079170). <br /> SCOPE OF WORK NECESSARY TO COMPLETELY UNCOVER SUMPS AND INSPECT AND REPAIR THE PENETRATION FITTINGS <br /> ON THE OUTSIDE OF THE SUMPS AND TO MAKE ALL NECESSARY REPAIRS TO LEAKING PENETRATION FITTINGS ON THE <br /> INSIDE OF THE SUMPS: Saw cut and break out concrete, haul off and dispose. Excavate pea gravel with Vac truck and by <br /> hand and shore excavation.Test sumps, inspect and repair outside of sumps as necessary. Remove turbines, risers, and <br /> associated piping and electrical to gain access to leaking penetration fittings inside of sumps. Remove and replace <br /> leaking fittings inside the sumps with new like items (Note: assumption is made that sumps were not damaged during <br /> initial installation). Test sumps. Reinstall removed equipment and associated piping and electrical. Purge system and <br /> conduct all necessary inspections and testing of primary and secondary piping, sumps, leak detection systems,tank <br /> monitoring systems, dispensing systems, etc. Remove shoring, replace pea gravel and pour concrete. Accomplish all <br /> necessary final inspections and testing in accordance with permit conditions to close out permit and bring#1 &#2 diesel <br /> fuel storage and dispensing systems back to full operational status. <br /> Please call or email at your earliest opportunity with any questions or concerns you may have.Thank you in advance for <br /> your prompt handling of this request. <br /> Regards,Joe <br /> Joseph Bagley(Capt. USAF-Ret), General Manager <br /> Bagley Enterprises, Inc., SB-DVBE, SDVOSB <br /> General Engineering& Construction Lic#774802 A, B, HAZ, C61(D21,D34,D40) <br /> DIR# 1000012690 <br /> GSA Contract#'s: GS-07F-0462Y <br /> CMAS Contract#'s 4-13-56-0051A <br /> 2370 Maggio Circle, Ste 4, Lodi, CA 95240 <br /> T#(209) 367-4800/F#367-5424/C#329-0582 <br /> E-mail:joe@bagleyenterprises.com <br /> Website: www.bagleyenterprises.com <br /> SA.GLEY ENTERPRISES,INC. <br /> ��SLlYj. <br /> —Confidentiality Note:This e-mail is intended only for the person or entity to <br /> which it is addressed,and may contain information that is privileged,confidential, <br /> or otherwise protected from disclosure. Dissemination,distribution,or copying of <br /> this e-mail or the information herein by anyone other than the intended recipient(s) <br /> 1 <br />