My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 11:01:14 AM
Creation date
11/8/2018 9:46:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MYRTLE\2849\PR0538822\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
4/13/2018 5:07:30 PM
QuestysRecordID
3854464
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />* In Section H, below, describe how and when these deficiencies were or win oe corrected. <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />® Yes <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Line Leak Detectors (LLD): <br />Cmm�lata thr fnllnwina rherklist <br />❑ Check this box if LLDs are not installed. <br />® Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />® Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />® N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />® Yes <br />❑ No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® Yes <br />❑ No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® Yes <br />❑ No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® Yes <br />❑ No* <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. comments: ELECTRONIC LINE LEAK DETECTORS <br />OVERFILL ALARMS TESTED FOR AUDIBLE VISUAL <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.