My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2021 11:01:14 AM
Creation date
11/8/2018 9:46:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0538822
PE
2351
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
St
City
Stockton
Zip
95205
APN
157-020-11
CURRENT_STATUS
01
SITE_LOCATION
2849 E Myrtle St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\M\MYRTLE\2849\PR0538822\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
4/13/2018 5:07:30 PM
QuestysRecordID
3854464
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p,CiUIN.. . <br /> °mac°, SAN JOAY U I N Environmental Health Department <br /> COUNTY Linda Turkatte, REHS, Director <br /> C, IFoa�\P Greatness grows here. Kasey Foley,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco, REHS, RDI <br /> Rodney Estrada, REHS <br /> Willy Ng, REHS <br /> August 15, 2018 Muniappa Naidu, REHS <br /> Joseph Bagley <br /> Bagley Enterprises, Inc. <br /> 2370 Maggio Cir. #4 <br /> Lodi, CA 95240 <br /> �b <br /> Re: Regional Transportation Center x" 0079170 <br /> 2849 E. Myrtle St., Stockton, CA 95205 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application for a permit to repair the diesel leak inside the transition sump in the filter room on the <br /> underground storage tank (UST) system at the above noted address. Two options were approved; the <br /> conditions and required inspections are the same for both options. The permit has been approved with <br /> the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at (209) 468-3440 to arrange the following inspection appointments (a <br /> 48-hour notice is required for inspection appointments). Please be aware that inspections for <br /> emergency work must be scheduled within five days of permit approval. <br /> a. Primary piping soap test: One hour pneumatic pressure test at 110% of operating pressure, <br /> or 40 psi, whichever is greater, of both diesel piping lines. <br /> b. Primary piping test: Witness tightness test performed by SWRCB licensed tank tester or <br /> receive passing 0.1 gallon per hour test results from the PLLD (if installed), of both diesel <br /> piping lines. A visual inspection is required for PLLD tested lines. <br /> c. Secondary piping soap test: One hour pressure test per manufacturer's guidelines, of both <br /> diesel piping lines. If there are no manufacturer's guidelines, test shall be performed using <br /> an applicable method specified in an industry code or engineering standard. <br /> d. Verification of Secondary piping slope, at 1/8 inch per foot or greater, to a containment sump <br /> with an audible/visual alarm. <br /> e. Verification of all pipe setbacks and burial depth according to the manufacturer's installation <br /> instructions. Verification of appropriate backfill. <br /> f. Integrity testing of the diesel transition sump per the manufacturer's installation instructions <br /> prior to backfill, and brine type verification and brine addition prior to backfill. <br /> g. Verification of brine communication in the diesel transition sump. <br /> h. Verification of continuous monitoring on both diesel piping lines and the diesel transition <br /> sump, once concrete is poured in accordance with the manufacturer's guidelines. <br /> i. Sampling under any removed piping and/or sumps. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.