SJRTD-FRACTURED DT-2 FIBERGLASS PIPING IN DIESEL TRANSITION SUMP-REV 1 <br /> PROBLEM: Diesel leak Inside the Diesel Transition Sump in the Filter Room(See Plan Sheet FS2.16 for location of <br /> filter room). <br /> Diesel Tank#2(DT-2)Smith Fiberglass product line as shown on Plan Sheets FS1.00, FS2.16, FS9.01, Detail 3,and <br /> Plan Sheet F510.01, Detail 1........is FRACTURED and seeping from the top portion of the Smith Fiberglass piping just <br /> forward of the penetration fitting on the inside of the Bravo Double Wall FRP Transition Sump(see Plan Sheet <br /> FS10.01, Detail 1(Fuel Filters Room Enlarged Plans)for clarification. <br /> SCOPE OF WORK: Note:Attempting to repair the line inside the transition sump without breaking concrete is not <br /> an option. Hence,the remaining two approaches outlined below wherein concrete must be removed are <br /> somewhat exploratory. NOTE: NOTIFY END USER THAT BOTH DT-1 AND DT-2 DIESEL DISPENSING SYSTEMS WILL BE <br /> SHUT DOWN FOR THE DURATION OF THE REPAIRS <br /> APPROACH#1: Involves DT-2 fueling system only. <br /> �� � <br /> ,:.z.-, <br /> 1. Shut down DT-2 product line and purge line of product. IUL 18 2018 <br /> 2. If deemed necessary,remove Filter#1 to facilitate demo of concrete in front of transition sump. <br /> 3. Demo approx 3'x 4'concrete in front of transition sump and expose DT-1 and DT-2 piping. <br /> 4. Remove approx 24"-36" of 4" DT-2 secondary piping to expose 3" DT-2 product line. ENVIRONMENTAL <br /> 5. Install test boots and purge DT-2 product line with Helium@ 50 psi test pressure. HEA!_TH PFQA.PT�,A.ENT <br /> 6. Test secondary from excavation point to STP sump for presence of Helium. NOTE: If Helium is detected, <br /> meaning that the primary line is leaking into the secondary,then work will commence to determine <br /> where the leak is located and an additional scope of work will be produced and added to this permit. If no <br /> Helium is detected attempt will be made to repair the leak from the front of the transition sump without <br /> removing the sump. <br /> 7. Working inside and outside of the sump disconnect 3" Flex Connector from 3" product line and remove <br /> 4"Smith Entry Fitting and approx 24" of 3" product line in front of sump. <br /> 8. Replace 4"Smith Entry Fitting with new like item. <br /> 9. Replace removed section of 3" product line and reconnect to Flex Connector. <br /> 10. Replace 4"secondary with Clamshell fitting. <br /> 11. Test primary and secondary piping of both DT-1 and DT-2 systems <br /> 12. Backfill and replace concrete. <br /> NOTE: If 4" Entry Fitting cannot be successfully removed and replaced without irreparable damage to the <br /> transition sump,then work will commence to APPROACH#2. <br /> APPROACH#2: Involves DT-1 and DT-2 systems. <br /> 1. Notify end users that both DT-1 and DT-2 systems will be out of commission FOR AN EXTENDED PERIOD. <br /> 2. PURGE DT-1 line of product. <br /> 3. Demo remaining concrete around transition sump <br /> 4. Working inside and outside of the sump disconnect 3" Flex Connector from 3" product line and remove <br /> 4"Smith Entry Fitting and approx 24"of 3" product line in front of sump. <br /> 5. Remove DT-1 and DT-2 piping from inside transition sump up to solenoid valves. <br /> 6. Remove and replace transition sump with new like item. <br /> 7. Reinstall DT-1 and DT-2 piping from inside transition sump up to solenoid valves. <br /> 8. Install new Smith 4" Entry Fittings. <br /> 9. Install 3" product lines and connect to Flex Connectors <br /> 10. Install 4"secondary piping with Clamshell fittings. <br /> 11. Test primary and secondary of both DT-1 and DT-2 systems. <br /> 12. Backfill and replace concrete. <br />